"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "芜湖工山110kV变电站新建工程",
|
||
"workContent": "设备检查,投产送电,芜湖工山110kV变电站新建工程,变电站验收、消缺作业,投产送电,芜湖工山110kV变电站新建工程,二次设备调试,电气调试试验,芜湖工山110kV变电站新建工程",
|
||
"foreman": "电气班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "118.275395",
|
||
"lat": "30.92267",
|
||
"workManage": "芮修军",
|
||
"workManagePhone": "18255376897",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12C0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "碱河-李楼110kV电缆线路工程标段01",
|
||
"workContent": "顶管掘进,顶管施工,DA10,顶管掘进,顶管施工,DA9",
|
||
"foreman": "段祥宇班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "116.786867",
|
||
"lat": "33.931226",
|
||
"workManage": "段祥宇",
|
||
"workManagePhone": "19856117969",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12P0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "城郊青山35kV变电站新建工程",
|
||
"workContent": "彩板压制、安装,钢结构彩板安装,城郊青山35kV变电站新建工程,装饰装修作业,装饰装修工程,城郊青山35kV变电站新建工程",
|
||
"foreman": "刘高宇班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "116.376227",
|
||
"lat": "31.55266",
|
||
"workManage": "刘高宇",
|
||
"workManagePhone": "18755417802",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12N0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "3",
|
||
"proName": "昭关-苍山220kV线路工程",
|
||
"workContent": "内悬浮外拉线抱杆分解组塔,角钢塔(钢管塔)施工,A24",
|
||
"foreman": "柯玉军班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "118.04307",
|
||
"lat": "31.710247",
|
||
"workManage": "柯玉军",
|
||
"workManagePhone": "15229653989",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12B0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "马鞍山苍山220kV变电站新建工程",
|
||
"workContent": "开挖深度在3m以内的基坑挖土(不含3m),土方开挖,苍山变电站内,电缆沟砌筑,砖砌电缆沟,苍山变电站内,消防管道管网施工,消防管道管网施工,苍山变电站内,装饰装修作业,装饰装修工程,苍山变电站内,混凝土作业,混凝土工程,苍山变电站内,钢筋安装,钢筋工程,苍山变电站内,接地网施工,接地网施工,苍山变电站内,模板安拆,模板工程,苍山变电站内",
|
||
"foreman": "孙文",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "118.146601",
|
||
"lat": "31.752974",
|
||
"workManage": "孙文",
|
||
"workManagePhone": "13635645649",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12B0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "学府路110kV变电站新建工程标段01",
|
||
"workContent": "消防管道管网施工,消防管道管网施工,合肥学府路变电站,接地网施工,接地网施工,学府路变电站,开挖深度在3m以内的基坑挖土(不含3m),土方开挖,合肥学府路变电站,模板安拆,模板工程,学府路变电站,钢筋安装,钢筋工程,学府路变电站,混凝土、砂浆搅拌及浇筑,混凝土工程,学府路变电站,主体填充墙砌筑,砌筑工程,合肥学府路变电站",
|
||
"foreman": "土建班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "117.402766",
|
||
"lat": "31.936779",
|
||
"workManage": "张茂华",
|
||
"workManagePhone": "18326166009",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12A0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "桥头集~刘桥T接富山线π入陂塘110kV线路工程标段01",
|
||
"workContent": "人力展放导引绳,导引绳展放,B9-B19架线准备(导引绳展放、绝缘子挂设、钻桩布置)",
|
||
"foreman": "桥头集~刘桥T接富山线π入陂塘110KV线路工程程启春班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "0",
|
||
"ballNo": null,
|
||
"lon": "117.555146",
|
||
"lat": "31.906686",
|
||
"workManage": "程启春",
|
||
"workManagePhone": "18734026168",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12A0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "灵泗~香涧500kV线路工程标段01",
|
||
"workContent": "机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,Y101,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,Y102,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,Y103",
|
||
"foreman": "袁玉民班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "0",
|
||
"ballNo": null,
|
||
"lon": "117.601871",
|
||
"lat": "33.250659",
|
||
"workManage": "袁玉民",
|
||
"workManagePhone": "19156952269",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12Z0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "西溪南110kV变电站新建工程",
|
||
"workContent": "模板安拆,模板工程,西溪南110kV变电站新建工程,混凝土作业,混凝土工程,西溪南110kV变电站新建工程,开挖深度在3m以内的基坑挖土(不含3m),土方开挖,西溪南110kV变电站新建工程,钢筋安装,钢筋工程,西溪南110kV变电站新建工程,接地网施工,接地网施工,西溪南110kV变电站新建工程",
|
||
"foreman": "土建一班",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "118.294404",
|
||
"lat": "29.847598",
|
||
"workManage": "朱是培",
|
||
"workManagePhone": "13915934854",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12S0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "安庆四-涓桥500千伏线路工程(一般线路段)标段01",
|
||
"workContent": "机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,G59",
|
||
"foreman": "贺振红班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "117.312004",
|
||
"lat": "30.517201",
|
||
"workManage": "贺振红",
|
||
"workManagePhone": "15252022734",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12Z0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "临港-花园湖牵引站220kV线路工程标段01",
|
||
"workContent": "流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,12#.21#.28#.37#.38#.39#",
|
||
"foreman": "李斌林",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "117.820551",
|
||
"lat": "32.89304",
|
||
"workManage": "李斌林",
|
||
"workManagePhone": "15328547299",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12L0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "宣城甘露220kV变电站新建工程",
|
||
"workContent": "变电站验收、消缺作业,投产送电,宣城甘露(宣五)新建变电站,一次电气设备交接试验,电气调试试验,宣城宣五(甘露)新建变电站1,二次设备调试,电气调试试验,宣城宣五(甘露)新建变电站1,软母线跳线、引下线、设备连线安装,软母线安装,宣城宣五(甘露)新建变电站1,电缆搬运、敷设二次接线,电缆敷设及二次接线,宣城宣五(甘露)新建变电站1",
|
||
"foreman": "电气",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "118.652579",
|
||
"lat": "30.867737",
|
||
"workManage": "邵延跃",
|
||
"workManagePhone": "13335576138",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12G0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "孔店~龙门500千伏线路增容改造工程",
|
||
"workContent": "流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,G103W",
|
||
"foreman": "王雷班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "117.104014",
|
||
"lat": "32.219314",
|
||
"workManage": "王雷",
|
||
"workManagePhone": "15296212091",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12Z0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "3",
|
||
"proName": "昭关-香泉、昭关-霸王π入苍山变电站220kV线路工程",
|
||
"workContent": "内悬浮外拉线抱杆分解组塔,角钢塔(钢管塔)施工,B12",
|
||
"foreman": "黄治祥班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "118.151634",
|
||
"lat": "31.718698",
|
||
"workManage": "黄治祥",
|
||
"workManagePhone": "15178427880",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12B0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "元通-护桥220kV线路工程",
|
||
"workContent": "机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,#A32,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,#A36,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,#A40,混凝土浇筑作业,混凝土浇筑,#A32,混凝土浇筑作业,混凝土浇筑,#A36,混凝土浇筑作业,混凝土浇筑,#A40,开掘敷设和焊接回填,接地工程,#A36,开掘敷设和焊接回填,接地工程,#A40,开掘敷设和焊接回填,接地工程,#A41",
|
||
"foreman": "岳璟班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "0",
|
||
"ballNo": null,
|
||
"lon": "118.951066",
|
||
"lat": "32.759201",
|
||
"workManage": "岳璟",
|
||
"workManagePhone": "13637001778",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12M0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "民安-江北220kV线路工程",
|
||
"workContent": "混凝土浇筑作业,混凝土浇筑,M36,钢筋绑扎安装作业,钢筋工程,M36,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,M36",
|
||
"foreman": "柳勇班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "118.23939",
|
||
"lat": "31.42003",
|
||
"workManage": "柳勇",
|
||
"workManagePhone": "15156209135",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12C0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "亳州真源220kV变电站新建工程标段01",
|
||
"workContent": "檩条及墙板安装,钢结构安装,亳州真源220kV变电站新建工程,装配式围墙施工,装配式围墙施工,亳州真源220kV变电站新建工程,装饰装修作业,装饰装修工程,亳州真源220kV变电站新建工程",
|
||
"foreman": "许滔班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "0",
|
||
"ballNo": null,
|
||
"lon": "116.200037",
|
||
"lat": "33.455036",
|
||
"workManage": "许滔",
|
||
"workManagePhone": "18355770991",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12T0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "3",
|
||
"proName": "敬亭-琴溪π入甘露变220kV架空线路工程",
|
||
"workContent": "导地线展放,导地线展放,B1,B2,B3,B4,C1,C2,C3,C4,原41#,原43#,流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,C4,附件安装,杆塔附件安装,B1,B2,B3,B4,C1,C2,C3,C4,原41#,原43#,杆塔、架线验收消缺,中间验收,B1,B2,B3,B4,C1,C2,C3,C4,原41#,原43#,紧线、挂线作业,紧线、挂线作业,B1,B2,B3,B4,C1,C2,C3,C4,原41#,原43#",
|
||
"foreman": "罗杰队",
|
||
"foremanPhone": null,
|
||
"ballStatus": "0",
|
||
"ballNo": null,
|
||
"lon": "118.652283",
|
||
"lat": "30.86672",
|
||
"workManage": "罗杰",
|
||
"workManagePhone": "13547729854",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12G0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "莲塘-枣园线泥河变T接线改接甘露变电站110kV架空线路工程",
|
||
"workContent": "机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,C24#,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,C25#,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,C26#,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,C42#",
|
||
"foreman": "周世虎",
|
||
"foremanPhone": null,
|
||
"ballStatus": "0",
|
||
"ballNo": null,
|
||
"lon": "118.717864",
|
||
"lat": "30.8909",
|
||
"workManage": "周世虎",
|
||
"workManagePhone": "13739298249",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12G0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "3",
|
||
"proName": "白莲崖-龙井 110kV 线路工程",
|
||
"workContent": "内悬浮内拉线抱杆分解组塔(应用国网芯降风险设备),角钢塔(钢管塔)施工,35#,36#,37#,38#,杆塔螺栓复紧与消缺,角钢塔(钢管塔)施工,35#,36#,37#,38#",
|
||
"foreman": "刘荣君",
|
||
"foremanPhone": null,
|
||
"ballStatus": "0",
|
||
"ballNo": null,
|
||
"lon": "116.340969",
|
||
"lat": "31.225774",
|
||
"workManage": "刘荣君",
|
||
"workManagePhone": "13350462900",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12N0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "阜阳李腰220kV变电站新建工程",
|
||
"workContent": "二次设备调试,电气调试试验,全站,一次电气设备交接试验,电气调试试验,全站,母线桥及其附件安装,母线桥施工作业,全站,变电站验收、消缺作业,投产送电,全站,报警与消防水系统调试,报警与消防水系统联合调试,站内,软母线跳线、引下线、设备连线安装,软母线安装,全站,电缆搬运、敷设二次接线,电缆敷设及二次接线,全站,接地网施工,接地网施工,油漆粉刷",
|
||
"foreman": "王立春班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "115.55729",
|
||
"lat": "33.176144",
|
||
"workManage": "王立春",
|
||
"workManagePhone": "15805688192",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12H0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "六安白鹭110kV变电站新建工程",
|
||
"workContent": "围墙工程施工,围墙工程,六安白鹭110kV变电站新建工程,钢筋安装,钢筋工程,六安白鹭110kV变电站新建工程,水电作业,水电工程,六安白鹭110kV变电站新建工程,混凝土作业,混凝土工程,六安白鹭110kV变电站新建工程,开挖深度在3m以内的基坑挖土(不含3m),土方开挖,六安白鹭110kV变电站新建工程,模板安拆,模板工程,六安白鹭110kV变电站新建工程,接地网施工,接地网施工,六安白鹭110kV变电站新建工程,防水、保温层施工,防水、保温层施工,六安白鹭110kV变电站新建工程,主体填充墙砌筑,砌筑工程,六安白鹭110kV变电站新建工程,抹灰施工,抹灰工程,六安白鹭110kV变电站新建工程,场地平整,站区四通一平、站区道路工程,六安白鹭110kV变电站新建工程,道路施工,站区四通一平、站区道路工程,六安白鹭110kV变电站新建工程,高度<8m的挡土墙施工,站区四通一平、站区道路工程,六安白鹭110kV变电站新建工程,现浇式电缆沟施工,现浇式电缆沟施工,六安白鹭110kV变电站新建工程",
|
||
"foreman": "乔玉班",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "116.563753",
|
||
"lat": "31.830925",
|
||
"workManage": "乔玉",
|
||
"workManagePhone": "15855225873",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12N0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "灵泗~香涧500kV线路工程标段01",
|
||
"workContent": "机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,K1,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,K2,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,M1-L,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,M1-R,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,M2-L,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,M2-R",
|
||
"foreman": "安秀中班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "117.574993",
|
||
"lat": "33.146251",
|
||
"workManage": "安秀中",
|
||
"workManagePhone": "17512639832",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12Z0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "3",
|
||
"proName": "东石笋~山七110kV线路工程",
|
||
"workContent": "附件安装,杆塔附件安装,B34#,B35#,B36#,B37#,B38#,B39#,B40#,B41#,B42#,B43#,B44#,B45#,B46#,B47#,B48#,B49#,B50#,B51#,B52#,B53#,B54#,B55#,B56#,人力展放导引绳,导引绳展放,B56,B57,B58,B59,B60,B61,杆塔螺栓复紧与消缺,角钢塔(钢管塔)施工,B34#-B61#",
|
||
"foreman": "周山华班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "116.64167",
|
||
"lat": "31.254646",
|
||
"workManage": "周山华",
|
||
"workManagePhone": "19995830040",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12N0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "沙河-毛庄Ⅱ回220kV线路改造工程",
|
||
"workContent": "流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,F2,杆塔螺栓复紧与消缺,角钢塔(钢管塔)施工,F1,杆塔螺栓复紧与消缺,角钢塔(钢管塔)施工,F2",
|
||
"foreman": "王银华班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "115.55469",
|
||
"lat": "33.070977",
|
||
"workManage": "王银华",
|
||
"workManagePhone": "18075396333",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12H0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "亳州古井110kV变电站新建工程标段01",
|
||
"workContent": "钢筋安装,钢筋工程,挡土墙基础,站内外道路,配电装置室基础,模板安拆,模板工程,挡土墙基础,站内外道路,配电装置室基础,场地平整,站区四通一平、站区道路工程,亳州古井110kV变电站新建工程,消防管道管网施工,消防管道管网施工,古井变电站,水电作业,水电工程,古井变电站,混凝土作业,混凝土工程,挡土墙基础,站内外道路,配电装置室基础,开挖深度在3m以内的基坑挖土(不含3m),土方开挖,挡土墙基础,站内外道路,配电装置室基础",
|
||
"foreman": "张富喜班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "115.708384",
|
||
"lat": "33.982958",
|
||
"workManage": "张富喜",
|
||
"workManagePhone": "15225734321",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12T0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "圣泉-龚王110kV线路工程标段01",
|
||
"workContent": "机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,A1#,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,A10#,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,A4#,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,A6#,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,A7#,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,A8#,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,A9#",
|
||
"foreman": "刘文成班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "117.236108",
|
||
"lat": "33.02556",
|
||
"workManage": "刘文成",
|
||
"workManagePhone": "15852190525",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12L0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "金峰-永胜π入木镇变电站110kV架空线路工程",
|
||
"workContent": "流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,新建#3,流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,新建#6",
|
||
"foreman": "单云涛班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "117.945645",
|
||
"lat": "30.685376",
|
||
"workManage": "单云涛",
|
||
"workManagePhone": "13866258673",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12R0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "合肥淠河110kV变电站新建工程标段01",
|
||
"workContent": "檩条及墙板安装,钢结构安装,合肥淠河(官亭Ⅱ)110kV变电站,装配式防火墙施工,装配式防火墙施工,合肥淠河(官亭Ⅱ)110kV变电站,装配式围墙施工,装配式围墙施工,合肥淠河(官亭Ⅱ)110kV变电站",
|
||
"foreman": "钢结构班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "116.885365",
|
||
"lat": "31.832769",
|
||
"workManage": "王鑫萌",
|
||
"workManagePhone": "13645207100",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12A0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "3",
|
||
"proName": "至德(东至)-政源220kV线路工程",
|
||
"workContent": "内悬浮内拉线抱杆分解组塔(应用国网芯降风险设备),角钢塔(钢管塔)施工,G11(A线),G13(A线),G21(A线),G22(A线),G22(A线),G23(A线),G24(A线),G25(A线),G26(A线),G27(A线),G28(A线),G29(A线),G30(A线),G31(A线),G32(A线),G33(A线),G34(A线),G35(A线)",
|
||
"foreman": "倪玉永班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "116.899942",
|
||
"lat": "30.087722",
|
||
"workManage": "倪玉永",
|
||
"workManagePhone": "13658789889",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12R0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "至德(东至)-政源220kV线路工程",
|
||
"workContent": "无人直升机展放导引绳,导引绳展放,G21-G35",
|
||
"foreman": "鲁从伟班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "116.909199",
|
||
"lat": "30.093871",
|
||
"workManage": "鲁从伟",
|
||
"workManagePhone": "18728341669",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12R0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "柏村~头铺220kV线路工程标段01",
|
||
"workContent": "流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,54#.55#,流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,C41#c42#c43#,流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,C44,流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,C45,流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,C46,流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,C53",
|
||
"foreman": "蒋兵",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "117.64377",
|
||
"lat": "33.035381",
|
||
"workManage": "蒋兵",
|
||
"workManagePhone": "15865459558",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12L0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "亳二~平圩(孔店)线路开断接入潘集变500千伏线路工程",
|
||
"workContent": "开掘敷设和焊接回填,接地工程,A1-23,开掘敷设和焊接回填,接地工程,A1-28,开掘敷设和焊接回填,接地工程,A2-23,开掘敷设和焊接回填,接地工程,A2-28,一般土石方及掏挖基础机械开挖,一般土石方开挖,A1-23,一般土石方及掏挖基础机械开挖,一般土石方开挖,A1-28,一般土石方及掏挖基础机械开挖,一般土石方开挖,A2-23,一般土石方及掏挖基础机械开挖,一般土石方开挖,A2-28,混凝土浇筑作业,混凝土浇筑,A1-23,混凝土浇筑作业,混凝土浇筑,A1-28,混凝土浇筑作业,混凝土浇筑,A2-23,混凝土浇筑作业,混凝土浇筑,A2-28,钢筋绑扎安装作业,钢筋工程,A1-23,钢筋绑扎安装作业,钢筋工程,A1-28,钢筋绑扎安装作业,钢筋工程,A2-23,钢筋绑扎安装作业,钢筋工程,A2-28",
|
||
"foreman": "王宜满班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "116.801841",
|
||
"lat": "32.785349",
|
||
"workManage": "王宜满",
|
||
"workManagePhone": "15156026072",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12Z0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "蓼城-俞林π入高镇变电站110kV线路工程",
|
||
"workContent": "钢筋绑扎安装作业,钢筋工程,30,钢筋绑扎安装作业,钢筋工程,33,钢筋绑扎安装作业,钢筋工程,34,钢筋绑扎安装作业,钢筋工程,35,钢筋绑扎安装作业,钢筋工程,36,钢筋绑扎安装作业,钢筋工程,38,钢筋绑扎安装作业,钢筋工程,40,混凝土浇筑作业,混凝土浇筑,30,混凝土浇筑作业,混凝土浇筑,33,混凝土浇筑作业,混凝土浇筑,34,混凝土浇筑作业,混凝土浇筑,35,混凝土浇筑作业,混凝土浇筑,36,混凝土浇筑作业,混凝土浇筑,38,混凝土浇筑作业,混凝土浇筑,40,开掘敷设和焊接回填,接地工程,30,开掘敷设和焊接回填,接地工程,33,开掘敷设和焊接回填,接地工程,34,开掘敷设和焊接回填,接地工程,35,开掘敷设和焊接回填,接地工程,36,开掘敷设和焊接回填,接地工程,38,开掘敷设和焊接回填,接地工程,40,一般土石方及掏挖基础机械开挖,一般土石方开挖,30,一般土石方及掏挖基础机械开挖,一般土石方开挖,33,一般土石方及掏挖基础机械开挖,一般土石方开挖,34,一般土石方及掏挖基础机械开挖,一般土石方开挖,35,一般土石方及掏挖基础机械开挖,一般土石方开挖,36#,一般土石方及掏挖基础机械开挖,一般土石方开挖,38,一般土石方及掏挖基础机械开挖,一般土石方开挖,40",
|
||
"foreman": "种亚军班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "0",
|
||
"ballNo": null,
|
||
"lon": "116.00359",
|
||
"lat": "32.138657",
|
||
"workManage": "种亚军",
|
||
"workManagePhone": "18712132232",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12N0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "2",
|
||
"proName": "河沥-桃花园牵引站220kV线路工程",
|
||
"workContent": "导地线展放(内含二级风险跨越),导地线展放,39,40 ,41,42,43,44,45,46,47,附件安装(内含二级风险跨越),杆塔附件安装,40,41,42,43,44,45,46,紧线、挂线作业(内含二级风险跨越),紧线、挂线作业,39,40 ,42,47,人力展放导引绳,导引绳展放,39,40 ,41,42,43,44,45,46,47",
|
||
"foreman": "蔡道平班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "118.965887",
|
||
"lat": "30.564471",
|
||
"workManage": "蔡道平",
|
||
"workManagePhone": "15856502072",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12G0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "友好-开元110kV架空线路工程",
|
||
"workContent": "流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,T18#,流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,T19#,流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,T20#,流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,T21#,杆塔螺栓复紧与消缺,角钢塔(钢管塔)施工,T18#,杆塔螺栓复紧与消缺,角钢塔(钢管塔)施工,T19#,杆塔螺栓复紧与消缺,角钢塔(钢管塔)施工,T20#,杆塔螺栓复紧与消缺,角钢塔(钢管塔)施工,T21#",
|
||
"foreman": "张松班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "118.819101",
|
||
"lat": "32.766562",
|
||
"workManage": "张松",
|
||
"workManagePhone": "18382592533",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12M0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "刘尧-屏山π入濉河变电站110kV线路工程标段01",
|
||
"workContent": "钢筋绑扎安装作业,钢筋工程,A1,钢筋绑扎安装作业,钢筋工程,A11,钢筋绑扎安装作业,钢筋工程,A12,钢筋绑扎安装作业,钢筋工程,A13,钢筋绑扎安装作业,钢筋工程,A14,钢筋绑扎安装作业,钢筋工程,A15,钢筋绑扎安装作业,钢筋工程,A16,钢筋绑扎安装作业,钢筋工程,A17,钢筋绑扎安装作业,钢筋工程,A18,钢筋绑扎安装作业,钢筋工程,A2,钢筋绑扎安装作业,钢筋工程,A3,钢筋绑扎安装作业,钢筋工程,A4,钢筋绑扎安装作业,钢筋工程,A5,一般土石方及掏挖基础机械开挖,一般土石方开挖,A1,一般土石方及掏挖基础机械开挖,一般土石方开挖,A11,一般土石方及掏挖基础机械开挖,一般土石方开挖,A12,一般土石方及掏挖基础机械开挖,一般土石方开挖,A13,一般土石方及掏挖基础机械开挖,一般土石方开挖,A14,一般土石方及掏挖基础机械开挖,一般土石方开挖,A15,一般土石方及掏挖基础机械开挖,一般土石方开挖,A16,一般土石方及掏挖基础机械开挖,一般土石方开挖,A17,一般土石方及掏挖基础机械开挖,一般土石方开挖,A18,一般土石方及掏挖基础机械开挖,一般土石方开挖,A2,一般土石方及掏挖基础机械开挖,一般土石方开挖,A3,一般土石方及掏挖基础机械开挖,一般土石方开挖,A4,一般土石方及掏挖基础机械开挖,一般土石方开挖,A5,混凝土浇筑作业,混凝土浇筑,A1,混凝土浇筑作业,混凝土浇筑,A11,混凝土浇筑作业,混凝土浇筑,A12,混凝土浇筑作业,混凝土浇筑,A13,混凝土浇筑作业,混凝土浇筑,A14,混凝土浇筑作业,混凝土浇筑,A15,混凝土浇筑作业,混凝土浇筑,A16,混凝土浇筑作业,混凝土浇筑,A17,混凝土浇筑作业,混凝土浇筑,A18,混凝土浇筑作业,混凝土浇筑,A2,混凝土浇筑作业,混凝土浇筑,A3,混凝土浇筑作业,混凝土浇筑,A4,混凝土浇筑作业,混凝土浇筑,A5,开掘敷设和焊接回填,接地工程,A1,开掘敷设和焊接回填,接地工程,A11,开掘敷设和焊接回填,接地工程,A12,开掘敷设和焊接回填,接地工程,A13,开掘敷设和焊接回填,接地工程,A14,开掘敷设和焊接回填,接地工程,A15,开掘敷设和焊接回填,接地工程,A16,开掘敷设和焊接回填,接地工程,A17,开掘敷设和焊接回填,接地工程,A18,开掘敷设和焊接回填,接地工程,A2,开掘敷设和焊接回填,接地工程,A3,开掘敷设和焊接回填,接地工程,A4,开掘敷设和焊接回填,接地工程,A5",
|
||
"foreman": "常城班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "117.840178",
|
||
"lat": "33.481832",
|
||
"workManage": "常城",
|
||
"workManagePhone": "13966050593",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12Q0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "3",
|
||
"proName": "茗南-熙湖T接城南变电站110千伏架空线路工程",
|
||
"workContent": "设计坑深小于16m的人工挖孔桩基础作业,人工挖孔桩基础作业,A16",
|
||
"foreman": "蔡海军班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "116.375023",
|
||
"lat": "30.455073",
|
||
"workManage": "蔡海军",
|
||
"workManagePhone": "15056697755",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12D0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "云谷-新港工业园T接芮冲变110kV电缆线路工程标段01",
|
||
"workContent": "钢筋模板作业,主体结构施工,4,钢筋模板作业,主体结构施工,5#,垫层施工,主体结构施工,4#,垫层施工,主体结构施工,5#,混凝土浇筑,主体结构施工,4#,混凝土浇筑,主体结构施工,5#,深度小于5m深基槽开挖及支护,沟槽开挖,4,深度小于5m深基槽开挖及支护,沟槽开挖,5#",
|
||
"foreman": "葛章文班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "117.204741",
|
||
"lat": "31.764871",
|
||
"workManage": "葛章文",
|
||
"workManagePhone": "13865993898",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12A0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "和平-邓村220千伏线路工程标段01",
|
||
"workContent": "一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,A1,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,A14,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,A15,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,A16,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,A17,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,A18,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,A2,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,A3,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,A4,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,A40,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,A41,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,A42,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,A43,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,A44,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,A45,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,A46,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,A47,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,A48#,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,A49,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,A50,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,A51,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,A52",
|
||
"foreman": "笪淦",
|
||
"foremanPhone": null,
|
||
"ballStatus": "0",
|
||
"ballNo": null,
|
||
"lon": "116.966491",
|
||
"lat": "30.793126",
|
||
"workManage": "笪淦",
|
||
"workManagePhone": "18168585548",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12D0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "蚌埠龚王110kV变电站新建工程标段01",
|
||
"workContent": "主体填充墙砌筑,砌筑工程,蚌埠龚王110kV变电站新建工程,抹灰施工,抹灰工程,蚌埠龚王110kV变电站新建工程,接地网施工,接地网施工,蚌埠龚王110kV变电站新建工程,钢筋安装,钢筋工程,蚌埠龚王110kV变电站新建工程,开挖深度在3m以内的基坑挖土(不含3m),土方开挖,蚌埠龚王110kV变电站新建工程,混凝土作业,混凝土工程,蚌埠龚王110kV变电站新建工程,水电作业,水电工程,蚌埠龚王110kV变电站新建工程,防水、保温层施工,防水、保温层施工,蚌埠龚王110kV变电站新建工程,模板安拆,模板工程,蚌埠龚王110kV变电站新建工程,场地平整,站区四通一平、站区道路工程,蚌埠龚王110kV变电站新建工程",
|
||
"foreman": "土建一班",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "117.233739",
|
||
"lat": "33.00027",
|
||
"workManage": "徐响",
|
||
"workManagePhone": "19955214920",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12L0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "文都-渡江、会宫-泉河π入古塘变电站220kV线路工程标段01",
|
||
"workContent": "人力、车辆或畜力运输(含栈桥搭设、拆除施工),工地运输,A15,人力、车辆或畜力运输(含栈桥搭设、拆除施工),工地运输,A16,人力、车辆或畜力运输(含栈桥搭设、拆除施工),工地运输,A19,人力、车辆或畜力运输(含栈桥搭设、拆除施工),工地运输,B15,人力、车辆或畜力运输(含栈桥搭设、拆除施工),工地运输,B18,人力、车辆或畜力运输(含栈桥搭设、拆除施工),工地运输,B19",
|
||
"foreman": "贺中林",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "117.265368",
|
||
"lat": "30.775456",
|
||
"workManage": "贺中林",
|
||
"workManagePhone": "18712338939",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12J0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "3",
|
||
"proName": "琴溪220kV变电站220kV甘露间隔改造工程",
|
||
"workContent": "二次电气设备安装,改扩建施工,琴溪变,电缆搬运、敷设二次接线,电缆敷设及二次接线,琴溪变,材料、设备搬运、绿化、地面卫生清扫,改扩建施工,琴溪变",
|
||
"foreman": "张涛班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "0",
|
||
"ballNo": null,
|
||
"lon": "118.453237",
|
||
"lat": "30.723946",
|
||
"workManage": "张涛",
|
||
"workManagePhone": "15855856250",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12G0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "滁州红桥220kV变电站新建工程",
|
||
"workContent": "高度不超过5m且跨度不超过10m混凝土模板支撑系统,模板工程,红桥变,模板安拆,模板工程,红桥变,道路施工,站区四通一平、站区道路工程,红桥变,场地平整,站区四通一平、站区道路工程,红桥变,水电作业,水电工程,红桥变,开挖深度在3m以内的基坑挖土(不含3m),土方开挖,红桥变,电缆沟砌筑,砖砌电缆沟,滁州红桥220kV变电站新建工程,钢筋安装,钢筋工程,红桥变,抹灰施工,抹灰工程,红桥变,接地网施工,接地网施工,红桥变,现浇式电缆沟施工,现浇式电缆沟施工,红桥变,混凝土、砂浆搅拌及浇筑,混凝土工程,红桥变,混凝土作业,混凝土工程,红桥变",
|
||
"foreman": "土建班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "118.375621",
|
||
"lat": "32.362372",
|
||
"workManage": "吴庆鹏",
|
||
"workManagePhone": "15755405200",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12M0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "北塔-五里桥π入高皇变电站110KV架空线路工程",
|
||
"workContent": "一般土石方及掏挖基础机械开挖,一般土石方开挖,G2,一般土石方及掏挖基础机械开挖,一般土石方开挖,G3,一般土石方及掏挖基础机械开挖,一般土石方开挖,G34,一般土石方及掏挖基础机械开挖,一般土石方开挖,G4,混凝土浇筑作业,混凝土浇筑,G2,混凝土浇筑作业,混凝土浇筑,G3,混凝土浇筑作业,混凝土浇筑,G34,混凝土浇筑作业,混凝土浇筑,G4,钢筋绑扎安装作业,钢筋工程,G2,钢筋绑扎安装作业,钢筋工程,G3,钢筋绑扎安装作业,钢筋工程,G34,钢筋绑扎安装作业,钢筋工程,G4,开掘敷设和焊接回填,接地工程,G2,开掘敷设和焊接回填,接地工程,G3,开掘敷设和焊接回填,接地工程,G34,开掘敷设和焊接回填,接地工程,G4",
|
||
"foreman": "华正土建施工班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "116.407261",
|
||
"lat": "31.801441",
|
||
"workManage": "崔吕俊",
|
||
"workManagePhone": "18075056489",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12N0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "安庆和平220千伏变电站新建工程",
|
||
"workContent": "边坡及护坡,站区四通一平、站区道路工程,安庆和平220千伏变电站新建工程,开挖深度在3m以内的基坑挖土(不含3m),土方开挖,和平变电站,水电作业,水电工程,安庆和平220千伏变电站新建工程,混凝土、砂浆搅拌及浇筑,混凝土工程,和平变电站,装饰装修作业,装饰装修工程,安庆和平220千伏变电站新建工程",
|
||
"foreman": "土建班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "116.833894",
|
||
"lat": "30.791322",
|
||
"workManage": "胡顺艮",
|
||
"workManagePhone": "18096636218",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12D0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "3",
|
||
"proName": "原鹿500kV变电站间隔扩建工程标段",
|
||
"workContent": "一次电气设备安装,改扩建施工,原鹿变,开挖深度在3m以内的基坑挖土(不含3m),土方开挖,原鹿变,设备支架及一般起重吊装,支架及其他吊装(通用于起重机吊装相关作业),原鹿变,接地网施工,接地网施工,原鹿变,抹灰施工,抹灰工程,原鹿变,一次电气设备交接试验,电气调试试验,原鹿变,材料、设备搬运、绿化、地面卫生清扫,改扩建施工,原鹿变,电缆支架、电缆预埋管、电缆槽盒安装,电缆敷设及二次接线,原鹿变,互感器、耦合电容器、避雷器安装,其他户外设备安装,原鹿变,混凝土、砂浆搅拌及浇筑,混凝土工程,原鹿变,软母线跳线、引下线、设备连线安装,软母线安装,原鹿变,搭设高度不超过24m的落地式双排钢管扣件脚手架、碗扣式脚手架、(续上)盘扣式脚手架,钢管脚手架搭设,原鹿变,电缆沟砌筑,砖砌电缆沟,原鹿变,二次设备调试,电气调试试验,原鹿变,开挖深度在3m以内的基坑挖土(不含3m),土方开挖,原鹿变",
|
||
"foreman": "王越班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "115.879869",
|
||
"lat": "32.66703",
|
||
"workManage": "王越",
|
||
"workManagePhone": "13093361110",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12Z0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "3",
|
||
"proName": "滁州崇本220kV变电站220kV龙源新街光伏间隔扩建工程",
|
||
"workContent": "一次电气设备安装,改扩建施工,崇本变,软母线跳线、引下线、设备连线安装,软母线安装,崇本变,设备支架及一般起重吊装,支架及其他吊装(通用于起重机吊装相关作业),崇本变,其它设备安装(主变中性设备等),其他户外设备安装,崇本变,电缆搬运、敷设二次接线,电缆敷设及二次接线,崇本变,材料、设备搬运、绿化、地面卫生清扫,改扩建施工,滁州崇本220kV变电站220kV龙源新街光伏间隔扩建工程,软母线制作,软母线安装,崇本变,接地网施工,接地网施工,滁州崇本220kV变电站220kV龙源新街光伏间隔扩建工程,屏、柜、箱搬运、开箱及就位,开关柜、屏安装,崇本变",
|
||
"foreman": "秦安庆",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "118.99421",
|
||
"lat": "32.654775",
|
||
"workManage": "秦安庆",
|
||
"workManagePhone": "15256284410",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12M0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "安庆四-涓桥500千伏线路工程(长江大跨越段)标段01",
|
||
"workContent": "机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,G18",
|
||
"foreman": "候为东班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "117.253032",
|
||
"lat": "30.61573",
|
||
"workManage": "候为东",
|
||
"workManagePhone": "13505591115",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12Z0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "3",
|
||
"proName": "宣城水西-大观110kV线路工程标段",
|
||
"workContent": "导地线展放,导地线展放,A44,A45,A46,A47",
|
||
"foreman": "张家辉班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "118.22552",
|
||
"lat": "30.401157",
|
||
"workManage": "张家辉",
|
||
"workManagePhone": "15181131612",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12G0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "清流-宝桥π入红桥变电站220kV线路工程",
|
||
"workContent": "一般土石方及掏挖基础机械开挖,一般土石方开挖,A31,一般土石方及掏挖基础机械开挖,一般土石方开挖,A34,一般土石方及掏挖基础机械开挖,一般土石方开挖,A35,一般土石方及掏挖基础机械开挖,一般土石方开挖,A36,钢筋绑扎安装作业,钢筋工程,A31,钢筋绑扎安装作业,钢筋工程,A34,钢筋绑扎安装作业,钢筋工程,A35,钢筋绑扎安装作业,钢筋工程,A36,混凝土浇筑作业,混凝土浇筑,A31,混凝土浇筑作业,混凝土浇筑,A34,混凝土浇筑作业,混凝土浇筑,A35,混凝土浇筑作业,混凝土浇筑,A36,开掘敷设和焊接回填,接地工程,A31,开掘敷设和焊接回填,接地工程,A34,开掘敷设和焊接回填,接地工程,A35,开掘敷设和焊接回填,接地工程,A36",
|
||
"foreman": "柳中方班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "118.315222",
|
||
"lat": "32.434913",
|
||
"workManage": "柳中方",
|
||
"workManagePhone": "13865289759",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12M0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "3",
|
||
"proName": "菊江-香隅π入至德变电站110kV线路工程",
|
||
"workContent": "导地线展放,导地线展放,B1-B8",
|
||
"foreman": "",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "116.879369",
|
||
"lat": "30.092105",
|
||
"workManage": "何清涛",
|
||
"workManagePhone": "15085557042",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12R0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "合肥淠河110kV变电站新建工程标段01",
|
||
"workContent": "混凝土、砂浆搅拌及浇筑,混凝土工程,合肥淠河(官亭Ⅱ)110kV变电站,道路施工,站区四通一平、站区道路工程,合肥淠河(官亭Ⅱ)110kV变电站,场地平整,站区四通一平、站区道路工程,合肥淠河(官亭Ⅱ)110kV变电站,高度<8m的挡土墙施工,站区四通一平、站区道路工程,合肥淠河(官亭Ⅱ)110kV变电站,抹灰施工,抹灰工程,合肥淠河(官亭Ⅱ)110kV变电站,主体填充墙砌筑,砌筑工程,合肥淠河(官亭Ⅱ)110kV变电站,预制构件运输.堆放.安装,预制电缆沟道件施工(压顶.盖板等参照执行),合肥淠河(官亭Ⅱ)110kV变电站,钢筋安装,钢筋工程,合肥淠河(官亭Ⅱ)110kV变电站,水电作业,水电工程,合肥淠河(官亭Ⅱ)110kV变电站,模板安拆,模板工程,合肥淠河(官亭Ⅱ)110kV变电站,现浇式电缆沟施工,现浇式电缆沟施工,合肥淠河110kV变电站新建工程,电缆沟砌筑,砖砌电缆沟,合肥淠河(官亭Ⅱ)110kV变电站,开挖深度在3m以内的基坑挖土(不含3m),土方开挖,合肥淠河(官亭Ⅱ)110kV变电站,接地网施工,接地网施工,合肥淠河(官亭Ⅱ)110kV变电站,装饰装修作业,装饰装修工程,合肥淠河(官亭Ⅱ)110kV变电站,防水、保温层施工,防水、保温层施工,合肥淠河(官亭Ⅱ)110kV变电站",
|
||
"foreman": "土建班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "116.903766",
|
||
"lat": "31.814839",
|
||
"workManage": "黄本初",
|
||
"workManagePhone": "15156642766",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12A0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "杜冲-易太π入双桥变电站110kV架空线路工程",
|
||
"workContent": "调直电缆,电缆附件安装施工,A,调直电缆,电缆附件安装施工,A杆-双桥变,调直电缆,电缆附件安装施工,B,调直电缆,电缆附件安装施工,B杆—双桥变,电缆接头制作,电缆附件安装施工,A,电缆接头制作,电缆附件安装施工,A杆-双桥变,电缆接头制作,电缆附件安装施工,B,电缆接头制作,电缆附件安装施工,B杆—双桥变",
|
||
"foreman": "线路班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "0",
|
||
"ballNo": null,
|
||
"lon": "118.608883",
|
||
"lat": "31.165132",
|
||
"workManage": "潘夫华",
|
||
"workManagePhone": "13505530840",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12C0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "3",
|
||
"proName": "围屏-叶家桥110千伏架空线路工程",
|
||
"workContent": "内悬浮外拉线抱杆分解组塔,角钢塔(钢管塔)施工,T13,T14,T25",
|
||
"foreman": "席胜利立塔班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "118.696066",
|
||
"lat": "31.589077",
|
||
"workManage": "席胜利",
|
||
"workManagePhone": "13855727473",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12B0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "3",
|
||
"proName": "洪武220kV变电站220kV花园湖牵引站间隔扩建工程标段01",
|
||
"workContent": "一次电气设备安装,改扩建施工,220kV洪武变电站,材料、设备搬运、绿化、地面卫生清扫,改扩建施工,220kV洪武变电站,二次设备调试,电气调试试验,220kV洪武变电站,接地网施工,接地网施工,220kV洪武变电站,软母线制作,软母线安装,220kV洪武变电站,电缆搬运、敷设二次接线,电缆敷设及二次接线,220kV洪武变电站,一次电气设备交接试验,电气调试试验,220kV洪武变电站",
|
||
"foreman": "电气安装-纪庭班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "117.687087",
|
||
"lat": "32.910585",
|
||
"workManage": "纪庭",
|
||
"workManagePhone": "13966737252",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12L0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "柏村~头铺220kV线路工程标段01",
|
||
"workContent": "流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,C66,流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,C67,流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,C68,流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,C71,流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,C73,流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,C74",
|
||
"foreman": "刘娇班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "117.609264",
|
||
"lat": "33.029097",
|
||
"workManage": "刘娇",
|
||
"workManagePhone": "15700325583",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12L0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "合肥芮冲110kV变电站新建工程标段01",
|
||
"workContent": "钢筋安装,钢筋工程,芮冲变,道路施工,站区四通一平、站区道路工程,芮冲变,场地平整,站区四通一平、站区道路工程,芮冲变,接地网施工,接地网施工,芮冲变,开挖深度在3m以内的基坑挖土(不含3m),土方开挖,芮冲变,混凝土作业,混凝土工程,芮冲变,模板安拆,模板工程,芮冲变,水电作业,水电工程,芮冲变,防水、保温层施工,防水、保温层施工,芮冲变,装饰装修作业,装饰装修工程,芮冲变",
|
||
"foreman": "土建班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "117.170632",
|
||
"lat": "31.707703",
|
||
"workManage": "王宏松",
|
||
"workManagePhone": "13956918819",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12A0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "合肥卧龙路110kV变电站3号主变扩建工程标段01",
|
||
"workContent": "混凝土作业,混凝土工程,合肥卧龙路110kV变电站3号主变扩建工程,开挖深度在3m以内的基坑挖土(不含3m),土方开挖,3#电容器室,钢筋安装,钢筋工程,合肥卧龙路110kV变电站3号主变扩建工程,模板安拆,模板工程,合肥卧龙路110kV变电站3号主变扩建工程",
|
||
"foreman": "土建施工班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "117.350603",
|
||
"lat": "31.93809",
|
||
"workManage": "王威",
|
||
"workManagePhone": "15398259966",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12A0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "黄山休宁大休326线π入兰渡35kV线路工程(架空)标段01",
|
||
"workContent": "设计坑深小于5m的掏挖基础人工开挖,掏挖基础基坑开挖,C16,设计坑深小于5m的掏挖基础人工开挖,掏挖基础基坑开挖,C17,设计坑深小于5m的掏挖基础人工开挖,掏挖基础基坑开挖,C18",
|
||
"foreman": "叶燕飞",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "118.094863",
|
||
"lat": "29.763518",
|
||
"workManage": "叶燕飞",
|
||
"workManagePhone": "13955981796",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12S0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "柏村~头铺220kV线路工程标段01",
|
||
"workContent": "流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,C29# C30# C31#,流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,C35# C36# C37#",
|
||
"foreman": "彭全文",
|
||
"foremanPhone": null,
|
||
"ballStatus": "0",
|
||
"ballNo": null,
|
||
"lon": "117.713733",
|
||
"lat": "33.067175",
|
||
"workManage": "彭全文",
|
||
"workManagePhone": "13551623179",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12L0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "芜湖衡山220kV变电站新建工程",
|
||
"workContent": "水电作业,水电工程,衡山变电站,钢筋安装,钢筋工程,芜湖衡山220kV变电站新建工程,道路施工,站区四通一平、站区道路工程,衡山变电站,开挖深度在3m以内的基坑挖土(不含3m),土方开挖,芜湖衡山220kV变电站新建工程,混凝土作业,混凝土工程,芜湖衡山220kV变电站新建工程,接地网施工,接地网施工,衡山变电站,模板安拆,模板工程,芜湖衡山220kV变电站新建工程",
|
||
"foreman": "吴义新土建班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "118.374413",
|
||
"lat": "31.442189",
|
||
"workManage": "吴义新",
|
||
"workManagePhone": "18225707215",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12C0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "茗南-熙湖T接城南变电站110千伏架空线路工程",
|
||
"workContent": "钢筋绑扎安装作业,钢筋工程,A10,钢筋绑扎安装作业,钢筋工程,A6,钢筋绑扎安装作业,钢筋工程,A7,设计坑深小于5m一般土石方人工开挖,一般土石方开挖,A10,设计坑深小于5m一般土石方人工开挖,一般土石方开挖,A6,设计坑深小于5m一般土石方人工开挖,一般土石方开挖,A7,混凝土浇筑作业,混凝土浇筑,A10,混凝土浇筑作业,混凝土浇筑,A6,混凝土浇筑作业,混凝土浇筑,A7",
|
||
"foreman": "唐书志班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "0",
|
||
"ballNo": null,
|
||
"lon": "116.37235",
|
||
"lat": "30.433856",
|
||
"workManage": "唐书志",
|
||
"workManagePhone": "18656532888",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12D0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "菊江-香隅π入至德变电站110kV线路工程",
|
||
"workContent": "流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,B10,流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,B9",
|
||
"foreman": "",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "116.900984",
|
||
"lat": "30.088908",
|
||
"workManage": "刘克中",
|
||
"workManagePhone": "17781439542",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12R0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "南屏-蓬莱路π入派河变电站110kV线路工程标段01",
|
||
"workContent": "钢筋绑扎安装作业,钢筋工程,NB11,钢筋绑扎安装作业,钢筋工程,NB17,钢筋绑扎安装作业,钢筋工程,NC10,钢筋绑扎安装作业,钢筋工程,ND6,钢筋绑扎安装作业,钢筋工程,ND7,一般土石方及掏挖基础机械开挖,一般土石方开挖,NB11,一般土石方及掏挖基础机械开挖,一般土石方开挖,NB17,一般土石方及掏挖基础机械开挖,一般土石方开挖,NC10,一般土石方及掏挖基础机械开挖,一般土石方开挖,ND6,一般土石方及掏挖基础机械开挖,一般土石方开挖,ND7,开掘敷设和焊接回填,接地工程,NB11,开掘敷设和焊接回填,接地工程,NB17,开掘敷设和焊接回填,接地工程,NC10,开掘敷设和焊接回填,接地工程,ND6,开掘敷设和焊接回填,接地工程,ND7,混凝土浇筑作业,混凝土浇筑,NB11,混凝土浇筑作业,混凝土浇筑,NB17,混凝土浇筑作业,混凝土浇筑,NC10,混凝土浇筑作业,混凝土浇筑,ND6,混凝土浇筑作业,混凝土浇筑,ND7",
|
||
"foreman": "孟宪勇班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "117.182627",
|
||
"lat": "31.6808",
|
||
"workManage": "孟宪勇",
|
||
"workManagePhone": "18342991424",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12A0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "3",
|
||
"proName": "宣城日新110kV变电站新建工程",
|
||
"workContent": "钢结构吊装,钢结构安装,主变及防火墙,配电装置室",
|
||
"foreman": "钢结构施工班组(郭翔翔)",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "118.66311",
|
||
"lat": "30.944567",
|
||
"workManage": "郭翔翔",
|
||
"workManagePhone": "13083410713",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12G0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "3",
|
||
"proName": "六安山杜220kV变电站新建工程",
|
||
"workContent": "钢结构吊装,钢结构安装,六安山杜220kV变电站新建工程",
|
||
"foreman": "闫川辉班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "116.652709",
|
||
"lat": "31.791692",
|
||
"workManage": "闫川辉",
|
||
"workManagePhone": "18326602873",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12N0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "头铺220kV变电站新建工程标段01",
|
||
"workContent": "装配式围墙施工,装配式围墙施工,头铺220kV变电站新建工程,檩条及墙板安装,钢结构安装,头铺220kV变电站新建工程",
|
||
"foreman": "钢结构班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "117.822657",
|
||
"lat": "33.112585",
|
||
"workManage": "姚顺宝",
|
||
"workManagePhone": "18175515484",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12L0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "灵泗~香涧500kV线路工程标段01",
|
||
"workContent": "机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,Y1,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,Y3,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,Y4,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,Y5,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,Y6",
|
||
"foreman": "陈小长班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "117.628801",
|
||
"lat": "33.595517",
|
||
"workManage": "陈小长",
|
||
"workManagePhone": "13155199108",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12Z0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "3",
|
||
"proName": " 双岭-和平220千伏线路工程标段01",
|
||
"workContent": "流动式起重机立塔(塔高60米以上),角钢塔(钢管塔)施工,B52",
|
||
"foreman": "黄铁班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "116.939367",
|
||
"lat": "30.701106",
|
||
"workManage": "黄铁",
|
||
"workManagePhone": "18857007988",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12D0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "韦寨~张营、牛庄~张营π入流鞍河变电站110kV线路工程",
|
||
"workContent": "杆塔螺栓复紧与消缺,角钢塔(钢管塔)施工,A2,杆塔螺栓复紧与消缺,角钢塔(钢管塔)施工,A3,杆塔螺栓复紧与消缺,角钢塔(钢管塔)施工,A4,杆塔螺栓复紧与消缺,角钢塔(钢管塔)施工,B1,杆塔螺栓复紧与消缺,角钢塔(钢管塔)施工,B2,流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,A3",
|
||
"foreman": "杨照伟班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "115.226681",
|
||
"lat": "33.050546",
|
||
"workManage": "杨照伟",
|
||
"workManagePhone": "13657761218",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12H0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "柏村~头铺220kV线路工程标段01",
|
||
"workContent": "流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,C38# C39# C40#",
|
||
"foreman": "陈川",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "117.693723",
|
||
"lat": "33.070347",
|
||
"workManage": "陈川",
|
||
"workManagePhone": "15892365912",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12L0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "宿州灵璧县竹园-朝阳 35kV架空线路工程标段01",
|
||
"workContent": "流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,N1,流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,N10,流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,N11,流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,N12,流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,N13,流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,N14,流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,N15,流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,N16,流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,N17,流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,N18,流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,N19,流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,N2,流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,N20,流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,N21,流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,N22,流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,N23,流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,N24,流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,N25,流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,N3,流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,N4,流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,N5,流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,N6,流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,N7,流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,N8,流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,N9",
|
||
"foreman": "组塔架线班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "117.579415",
|
||
"lat": "33.93406",
|
||
"workManage": "刘靖靖",
|
||
"workManagePhone": "15385719666",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12Q0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "蓉城-天屏(T接永胜)π入木镇变电站110kV线路工程",
|
||
"workContent": "人力、车辆或畜力运输(含栈桥搭设、拆除施工),工地运输,A34,人力、车辆或畜力运输(含栈桥搭设、拆除施工),工地运输,B2,人力、车辆或畜力运输(含栈桥搭设、拆除施工),工地运输,B20,人力、车辆或畜力运输(含栈桥搭设、拆除施工),工地运输,B22,人力、车辆或畜力运输(含栈桥搭设、拆除施工),工地运输,B24,人力、车辆或畜力运输(含栈桥搭设、拆除施工),工地运输,新建#2,人力、车辆或畜力运输(含栈桥搭设、拆除施工),工地运输,新建#29,人力、车辆或畜力运输(含栈桥搭设、拆除施工),工地运输,新建#3",
|
||
"foreman": "夏宏飞班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "0",
|
||
"ballNo": null,
|
||
"lon": "117.967232",
|
||
"lat": "30.724932",
|
||
"workManage": "夏宏飞",
|
||
"workManagePhone": "15256295858",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12R0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "3",
|
||
"proName": "原鹿500kV变电站间隔扩建工程标段",
|
||
"workContent": "变压器.电抗器安装(油浸/不吊罩),油浸电力变压器.油浸电抗器施工作业,原鹿变,软母线跳线、引下线、设备连线安装,软母线安装,原鹿变,一次电气设备交接试验,电气调试试验,原鹿变,电缆搬运、敷设二次接线,电缆敷设及二次接线,原鹿变,接地网施工,接地网施工,原鹿变,互感器、耦合电容器、避雷器安装,其他户外设备安装,原鹿变,隔离开关安装、调整,隔离开关安装与调整,原鹿变,材料、设备搬运、绿化、地面卫生清扫,改扩建施工,原鹿变,一次电气设备交接试验,电气调试试验,原鹿变",
|
||
"foreman": "",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "115.879251",
|
||
"lat": "32.667255",
|
||
"workManage": "阮仁才",
|
||
"workManagePhone": "13966833570",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12Z0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "柏村~头铺220kV线路工程标段01",
|
||
"workContent": "流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,C6-C14",
|
||
"foreman": "刘彦雷班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "0",
|
||
"ballNo": null,
|
||
"lon": "117.828766",
|
||
"lat": "33.1247",
|
||
"workManage": "刘彦雷",
|
||
"workManagePhone": "15212178736",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12L0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "板集电厂二期-原鹿500kV线路工程标段",
|
||
"workContent": "人力展放导引绳,导引绳展放,N114,人力展放导引绳,导引绳展放,N115,人力展放导引绳,导引绳展放,N116,人力展放导引绳,导引绳展放,N117,人力展放导引绳,导引绳展放,N118,人力展放导引绳,导引绳展放,N119,人力展放导引绳,导引绳展放,N120,挂绝缘子及放线滑车,绝缘子挂设,N114,挂绝缘子及放线滑车,绝缘子挂设,N115,挂绝缘子及放线滑车,绝缘子挂设,N116,挂绝缘子及放线滑车,绝缘子挂设,N117,挂绝缘子及放线滑车,绝缘子挂设,N118,挂绝缘子及放线滑车,绝缘子挂设,N119,挂绝缘子及放线滑车,绝缘子挂设,N120",
|
||
"foreman": "顺全七班",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "116.079429",
|
||
"lat": "32.833662",
|
||
"workManage": "王帅",
|
||
"workManagePhone": "15375587677",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12Z0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "香涧~钟阳π入头铺变电站220kV线路工程标段01",
|
||
"workContent": "流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,A1#-A13#",
|
||
"foreman": "张志宇班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "117.789516",
|
||
"lat": "33.106515",
|
||
"workManage": "张志宇",
|
||
"workManagePhone": "18655863556",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12L0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "3",
|
||
"proName": "太和-徐寨π入李腰变电站220kV线路工程",
|
||
"workContent": "导地线展放,导地线展放,B10,B11,B12,B13,B14,B15,B8,B9,B7,附件安装,杆塔附件安装,B1,B10,B11,B12,B13,B14,B15,B8,B9,B2,B4,B5,B7,紧线、挂线作业,紧线、挂线作业,B10,B11,B12,B13,B14,B15,B8,B9,B7",
|
||
"foreman": "王学军班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "115.521399",
|
||
"lat": "33.166402",
|
||
"workManage": "王学军",
|
||
"workManagePhone": "13324641999",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12H0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "苏埠-石堰35kV架空线路工程",
|
||
"workContent": "钢筋绑扎安装作业,钢筋工程,#23,钢筋绑扎安装作业,钢筋工程,#24,钢筋绑扎安装作业,钢筋工程,#26,一般土石方及掏挖基础机械开挖,一般土石方开挖,#23,一般土石方及掏挖基础机械开挖,一般土石方开挖,#24,一般土石方及掏挖基础机械开挖,一般土石方开挖,#26,开掘敷设和焊接回填,接地工程,#23,开掘敷设和焊接回填,接地工程,#24,开掘敷设和焊接回填,接地工程,#26,混凝土浇筑作业,混凝土浇筑,#23,混凝土浇筑作业,混凝土浇筑,#24,混凝土浇筑作业,混凝土浇筑,#26",
|
||
"foreman": "土建班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "116.412684",
|
||
"lat": "31.60197",
|
||
"workManage": "王贤超",
|
||
"workManagePhone": "15856483128",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12N0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "亳二~平圩(孔店)线路开断接入潘集变500千伏线路工程",
|
||
"workContent": "机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,A1-22,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,A2-22",
|
||
"foreman": "吴朋班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "116.780802",
|
||
"lat": "32.794895",
|
||
"workManage": "吴朋",
|
||
"workManagePhone": "15075744448",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12Z0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "亳二~平圩(孔店)线路开断接入潘集变500千伏线路工程",
|
||
"workContent": "流动式起重机立塔(塔高60米以上),角钢塔(钢管塔)施工,A1-54,流动式起重机立塔(塔高60米以上),角钢塔(钢管塔)施工,A1-55,流动式起重机立塔(塔高60米以上),角钢塔(钢管塔)施工,A2-54,流动式起重机立塔(塔高60米以上),角钢塔(钢管塔)施工,A2-55",
|
||
"foreman": "线路25班",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "116.840813",
|
||
"lat": "32.893816",
|
||
"workManage": "刘鹏",
|
||
"workManagePhone": "17723563076",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12Z0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "滁州开元110kV变电站新建工程",
|
||
"workContent": "开挖深度在3m以内的基坑挖土(不含3m),土方开挖,滁州开元110kV变电站新建工程,模板安拆,模板工程,滁州开元110kV变电站新建工程,钢筋安装,钢筋工程,滁州开元110kV变电站新建工程,场地平整,站区四通一平、站区道路工程,滁州开元110kV变电站新建工程,混凝土作业,混凝土工程,滁州开元110kV变电站新建工程",
|
||
"foreman": "土建班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "118.794224",
|
||
"lat": "32.799931",
|
||
"workManage": "王怀玉",
|
||
"workManagePhone": "18955880604",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12M0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": " 沙河-太和改接李腰、李腰-太和220kV线路工程",
|
||
"workContent": "杆塔螺栓复紧与消缺,角钢塔(钢管塔)施工,C17,杆塔螺栓复紧与消缺,角钢塔(钢管塔)施工,C20,杆塔螺栓复紧与消缺,角钢塔(钢管塔)施工,C21,杆塔螺栓复紧与消缺,角钢塔(钢管塔)施工,C23,杆塔螺栓复紧与消缺,角钢塔(钢管塔)施工,C24,杆塔螺栓复紧与消缺,角钢塔(钢管塔)施工,C4,流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,C17,流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,C20,流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,C21,流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,C23,流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,C24,流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,C4",
|
||
"foreman": "张义",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "115.55347",
|
||
"lat": "33.169058",
|
||
"workManage": "张义",
|
||
"workManagePhone": "15082698053",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12H0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "高皇220kV变电站新建工程",
|
||
"workContent": "混凝土、砂浆搅拌及浇筑,混凝土工程,高皇220kV变电站新建工程,消防管道管网施工,消防管道管网施工,高皇220kV变电站新建工程,模板安拆,模板工程,高皇220kV变电站新建工程",
|
||
"foreman": "土建施工班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "116.397672",
|
||
"lat": "31.80827",
|
||
"workManage": "邱跃军",
|
||
"workManagePhone": "13956375705",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12N0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "灵泗~香涧500kV线路工程标段01",
|
||
"workContent": "机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,Y33,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,Y34,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,Y35,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,Y36,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,Y37,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,Y38,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,Y39,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,Y40",
|
||
"foreman": "徐洋班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "117.607902",
|
||
"lat": "33.474804",
|
||
"workManage": "徐洋",
|
||
"workManagePhone": "15052492642",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12Z0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "孔店~龙门500千伏线路增容改造工程",
|
||
"workContent": "流动式起重机立塔(塔高60米以上),角钢塔(钢管塔)施工,G81,流动式起重机立塔(塔高60米以上),角钢塔(钢管塔)施工,G82,流动式起重机立塔(塔高60米以上),角钢塔(钢管塔)施工,G83,流动式起重机立塔(塔高60米以上),角钢塔(钢管塔)施工,G95",
|
||
"foreman": "俞前华",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "117.09708",
|
||
"lat": "32.311145",
|
||
"workManage": "俞前华",
|
||
"workManagePhone": "15178599760",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12Z0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "亳二~平圩(孔店)线路开断接入潘集变500千伏线路工程",
|
||
"workContent": "开掘敷设和焊接回填,接地工程,A1-34,开掘敷设和焊接回填,接地工程,A1-38,开掘敷设和焊接回填,接地工程,A2-38,混凝土浇筑作业,混凝土浇筑,A1-34,混凝土浇筑作业,混凝土浇筑,A1-38,混凝土浇筑作业,混凝土浇筑,A2-38,一般土石方及掏挖基础机械开挖,一般土石方开挖,A1-34,一般土石方及掏挖基础机械开挖,一般土石方开挖,A1-38,一般土石方及掏挖基础机械开挖,一般土石方开挖,A2-38,钢筋绑扎安装作业,钢筋工程,A1-34,钢筋绑扎安装作业,钢筋工程,A1-38,钢筋绑扎安装作业,钢筋工程,A2-38",
|
||
"foreman": "李文兵班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "116.81466",
|
||
"lat": "32.852709",
|
||
"workManage": "李文兵",
|
||
"workManagePhone": "18255431917",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12Z0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "民安-江北220kV线路工程",
|
||
"workContent": "混凝土浇筑作业,混凝土浇筑,M12,钢筋绑扎安装作业,钢筋工程,M12,开掘敷设和焊接回填,接地工程,M12,设计坑深小于5m一般土石方人工开挖,一般土石方开挖,M12",
|
||
"foreman": "季茂文班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "118.256546",
|
||
"lat": "31.375",
|
||
"workManage": "季茂文",
|
||
"workManagePhone": "15162016829",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12C0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "蚌埠龚王110kV变电站新建工程标段01",
|
||
"workContent": "干式电抗器安装,其他户外设备安装,蚌埠龚王110kV变电站新建工程,互感器、耦合电容器、避雷器安装,其他户外设备安装,蚌埠龚王110kV变电站新建工程,设备支架及一般起重吊装,支架及其他吊装(通用于起重机吊装相关作业),蚌埠龚王110kV变电站新建工程,构架、横梁拼装,构架拼装、吊装,蚌埠龚王110kV变电站新建工程,接地网施工,接地网施工,蚌埠龚王110kV变电站新建工程",
|
||
"foreman": "电气班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "117.234012",
|
||
"lat": "32.99999",
|
||
"workManage": "李良",
|
||
"workManagePhone": "13909629559",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12L0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "孔店~龙门500千伏线路增容改造工程",
|
||
"workContent": "流动式起重机立塔(塔高60米以上),角钢塔(钢管塔)施工,G77",
|
||
"foreman": "文加立班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "117.104013",
|
||
"lat": "32.314458",
|
||
"workManage": "文加立",
|
||
"workManagePhone": "18090515823",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12Z0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "宣城华阳(溪马)110kV变电站新建工程",
|
||
"workContent": "电缆沟砌筑,砖砌电缆沟,华阳变,主体填充墙砌筑,砌筑工程,华阳变,抹灰施工,抹灰工程,华阳变,模板安拆,模板工程,华阳变,接地网施工,接地网施工,华阳变,钢筋安装,钢筋工程,华阳变,混凝土作业,混凝土工程,华阳变,开挖深度在3m以内的基坑挖土(不含3m),土方开挖,华阳变",
|
||
"foreman": "土建班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "118.557516",
|
||
"lat": "30.049792",
|
||
"workManage": "边世界",
|
||
"workManagePhone": "13855839181",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12G0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "香涧~钟阳π入头铺变电站220kV线路工程标段01",
|
||
"workContent": "流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,A14-A27",
|
||
"foreman": "王顺林班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "117.737013",
|
||
"lat": "33.103122",
|
||
"workManage": "王顺林",
|
||
"workManagePhone": "18739069357",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12L0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "潘集500千伏变电站新建工程",
|
||
"workContent": "混凝土、砂浆搅拌及浇筑,混凝土工程,潘集500千伏变电站新建工程,接地网施工,接地网施工,潘集500千伏变电站新建工程,水电作业,水电工程,潘集500千伏变电站新建工程,场地平整,站区四通一平、站区道路工程,潘集500千伏变电站新建工程,模板安拆,模板工程,潘集500千伏变电站新建工程,开挖深度在5m以内的基坑挖土(不含5m),土方开挖,潘集500千伏变电站新建工程,开挖深度在3m以内的基坑挖土(不含3m),土方开挖,潘集500千伏变电站新建工程,电缆沟砌筑,砖砌电缆沟,潘集500千伏变电站新建工程,钢筋安装,钢筋工程,潘集500千伏变电站新建工程,防水、保温层施工,防水、保温层施工,潘集500千伏变电站新建工程",
|
||
"foreman": "土建班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "116.749775",
|
||
"lat": "32.770011",
|
||
"workManage": "杨可文",
|
||
"workManagePhone": "13956629860",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12Z0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "安庆和平220千伏变电站新建工程",
|
||
"workContent": "软母线制作,软母线安装,和平变现场,户外GIS就位、安装及充气,GIS组合电器安装,和平变现场,母线桥及其附件安装,母线桥施工作业,和平变现场,屏、柜、箱搬运、开箱及就位,开关柜、屏安装,和平变现场,接地网施工,接地网施工,和平变电站现场,电缆搬运、敷设二次接线,电缆敷设及二次接线,和平变现场,互感器、耦合电容器、避雷器安装,其他户外设备安装,和平变现场,其它设备安装(主变中性设备等),其他户外设备安装,和平变现场",
|
||
"foreman": "李满义班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "116.833811",
|
||
"lat": "30.791368",
|
||
"workManage": "李满义",
|
||
"workManagePhone": "15256191199",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12D0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "灵泗~香涧500kV线路工程标段01",
|
||
"workContent": "机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,Y42",
|
||
"foreman": "周恩辉班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "117.620811",
|
||
"lat": "33.487471",
|
||
"workManage": "周恩辉",
|
||
"workManagePhone": "13865270479",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12Z0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "灵泗~香涧500kV线路工程标段01",
|
||
"workContent": "机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,Y100,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,Y97,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,Y98,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,Y99",
|
||
"foreman": "李富班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "117.600689",
|
||
"lat": "33.25751",
|
||
"workManage": "李富",
|
||
"workManagePhone": "19166579233",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12Z0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "横山-贺庄220kV线路工程",
|
||
"workContent": "机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,GB98,钢筋绑扎安装作业,钢筋工程,GB98,混凝土浇筑作业,混凝土浇筑,GB98,开掘敷设和焊接回填,接地工程,GB98",
|
||
"foreman": "屈文强班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "118.044863",
|
||
"lat": "32.778167",
|
||
"workManage": "屈文强",
|
||
"workManagePhone": "15212586729",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12M0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "通江-江北220kV线路工程",
|
||
"workContent": "钢筋绑扎安装作业,钢筋工程,T14,钢筋绑扎安装作业,钢筋工程,T5,混凝土浇筑作业,混凝土浇筑,T14,混凝土浇筑作业,混凝土浇筑,T5,设计坑深小于5m一般土石方人工开挖,一般土石方开挖,T14,设计坑深小于5m一般土石方人工开挖,一般土石方开挖,T5,开掘敷设和焊接回填,接地工程,T14,开掘敷设和焊接回填,接地工程,T5",
|
||
"foreman": "张爽爽班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "0",
|
||
"ballNo": null,
|
||
"lon": "118.250158",
|
||
"lat": "31.380027",
|
||
"workManage": "张爽爽",
|
||
"workManagePhone": "13329075889",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12C0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "迎仙110kV变电站新建工程",
|
||
"workContent": "钢筋安装,钢筋工程,迎仙110kV变电站新建工程,道路施工,站区四通一平、站区道路工程,迎仙110kV变电站新建工程,防水、保温层施工,防水、保温层施工,迎仙110kV变电站新建工程,模板安拆,模板工程,迎仙110kV变电站新建工程,接地网施工,接地网施工,迎仙110kV变电站新建工程,水电作业,水电工程,迎仙110kV变电站新建工程,混凝土、砂浆搅拌及浇筑,混凝土工程,迎仙110kV变电站新建工程,混凝土作业,混凝土工程,迎仙110kV变电站新建工程,抹灰施工,抹灰工程,迎仙110kV变电站新建工程,现浇式电缆沟施工,现浇式电缆沟施工,迎仙110kV变电站新建工程",
|
||
"foreman": "迎仙变土建班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "115.157274",
|
||
"lat": "32.928471",
|
||
"workManage": "康世伟",
|
||
"workManagePhone": "18298198254",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12H0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "3",
|
||
"proName": " 沙河-太和改接李腰、李腰-太和220kV线路工程",
|
||
"workContent": "流动式起重机立塔(塔高60米以上),角钢塔(钢管塔)施工,C2,流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,C22",
|
||
"foreman": "王银华",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "115.556372",
|
||
"lat": "33.173993",
|
||
"workManage": "王银华",
|
||
"workManagePhone": "18075396333",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12H0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "蚌埠安东110kV变电站新建工程标段01",
|
||
"workContent": "主体填充墙砌筑,砌筑工程,蚌埠安东110kV变电站新建工程,钢筋安装,钢筋工程,蚌埠安东110kV变电站新建工程,混凝土作业,混凝土工程,蚌埠安东110kV变电站新建工程,开挖深度在3m以内的基坑挖土(不含3m),土方开挖,蚌埠安东110kV变电站新建工程,模板安拆,模板工程,蚌埠安东110kV变电站新建工程,接地网施工,接地网施工,蚌埠安东110kV变电站新建工程",
|
||
"foreman": "赵伟班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "117.563233",
|
||
"lat": "32.860132",
|
||
"workManage": "赵伟",
|
||
"workManagePhone": "13918076300",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12L0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "众兴-草庙乡牵引站220kV架空线路工程标段01",
|
||
"workContent": "一般土石方及掏挖基础机械开挖,一般土石方开挖,A4、A6、A9、A10、A11、A12、A13、A14、A27、A28、A29、A30、A32、A33基础开挖、垫层浇筑、钢筋绑扎、模板支护、平台搭设、混凝土浇制、接地埋设 ",
|
||
"foreman": "王龙德",
|
||
"foremanPhone": null,
|
||
"ballStatus": "0",
|
||
"ballNo": null,
|
||
"lon": "117.444571",
|
||
"lat": "32.022035",
|
||
"workManage": "王龙德",
|
||
"workManagePhone": "15178659985",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12A0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": " 双岭-和平220千伏线路工程标段01",
|
||
"workContent": "杆塔螺栓复紧与消缺,角钢塔(钢管塔)施工,B31",
|
||
"foreman": "刘和林班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "116.867333",
|
||
"lat": "30.782489",
|
||
"workManage": "刘和林",
|
||
"workManagePhone": "13856571875",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12D0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "谯东风电场升压站-木兰110kV线路工程标段01",
|
||
"workContent": "机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,A30#,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,A31#,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,A33#",
|
||
"foreman": "马兆峰土建班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "115.87284",
|
||
"lat": "33.882738",
|
||
"workManage": "马兆峰",
|
||
"workManagePhone": "19018082162",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12T0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "芜湖衡山220kV变电站新建工程",
|
||
"workContent": "水电作业,水电工程,衡山变电站,钢筋安装,钢筋工程,芜湖衡山220kV变电站新建工程,道路施工,站区四通一平、站区道路工程,衡山变电站,混凝土作业,混凝土工程,芜湖衡山220kV变电站新建工程,模板安拆,模板工程,芜湖衡山220kV变电站新建工程,接地网施工,接地网施工,衡山变电站,开挖深度在3m以内的基坑挖土(不含3m),土方开挖,芜湖衡山220kV变电站新建工程",
|
||
"foreman": "吴义新土建班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "118.374453",
|
||
"lat": "31.442158",
|
||
"workManage": "吴义新",
|
||
"workManagePhone": "18225707215",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12C0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "3",
|
||
"proName": "文都-渡江、会宫-泉河π入古塘变电站220kV线路工程标段01",
|
||
"workContent": "内悬浮外拉线抱杆分解组塔,角钢塔(钢管塔)施工,A4,B4",
|
||
"foreman": "蔡海林班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "117.251647",
|
||
"lat": "30.807499",
|
||
"workManage": "蔡海林",
|
||
"workManagePhone": "15255638388",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12J0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "昭关-香泉、昭关-霸王π入苍山变电站220kV线路工程",
|
||
"workContent": "开掘敷设和焊接回填,接地工程,B1,开掘敷设和焊接回填,接地工程,B17,开掘敷设和焊接回填,接地工程,B2,开掘敷设和焊接回填,接地工程,B3,开掘敷设和焊接回填,接地工程,B7,开掘敷设和焊接回填,接地工程,B8,开掘敷设和焊接回填,接地工程,C1,开掘敷设和焊接回填,接地工程,C17,开掘敷设和焊接回填,接地工程,C2,开掘敷设和焊接回填,接地工程,C3,开掘敷设和焊接回填,接地工程,C7,开掘敷设和焊接回填,接地工程,C8,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,B1,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,B17,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,B2,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,B3,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,B7,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,B8,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,C1,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,C17,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,C2,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,C3,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,C7,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,C8,混凝土浇筑作业,混凝土浇筑,B1,混凝土浇筑作业,混凝土浇筑,B17,混凝土浇筑作业,混凝土浇筑,B2,混凝土浇筑作业,混凝土浇筑,B3,混凝土浇筑作业,混凝土浇筑,B7,混凝土浇筑作业,混凝土浇筑,B8,混凝土浇筑作业,混凝土浇筑,C1,混凝土浇筑作业,混凝土浇筑,C17,混凝土浇筑作业,混凝土浇筑,C2,混凝土浇筑作业,混凝土浇筑,C3,混凝土浇筑作业,混凝土浇筑,C7,混凝土浇筑作业,混凝土浇筑,C8",
|
||
"foreman": "土建二班",
|
||
"foremanPhone": null,
|
||
"ballStatus": "0",
|
||
"ballNo": null,
|
||
"lon": "118.148104",
|
||
"lat": "31.750262",
|
||
"workManage": "黄德进",
|
||
"workManagePhone": "15161317472",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12B0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "铜陵古塘220kV变电站新建工程标段01",
|
||
"workContent": "接地网施工,接地网施工,铜陵古塘220kV变电站新建工程,电缆支架、电缆预埋管、电缆槽盒安装,电缆敷设及二次接线,铜陵古塘220kV变电站新建工程,设备支架及一般起重吊装,支架及其他吊装(通用于起重机吊装相关作业),铜陵古塘220kV变电站新建工程",
|
||
"foreman": "代君健",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "117.273849",
|
||
"lat": "30.737366",
|
||
"workManage": "代君建",
|
||
"workManagePhone": "18356750816",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12J0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "孔店~龙门500千伏线路增容改造工程",
|
||
"workContent": "流动式起重机立塔(塔高60米以上),角钢塔(钢管塔)施工,G69,流动式起重机立塔(塔高60米以上),角钢塔(钢管塔)施工,G73",
|
||
"foreman": "杨青春",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "117.088047",
|
||
"lat": "32.353163",
|
||
"workManage": "杨青春",
|
||
"workManagePhone": "18980339798",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12Z0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "安徽芜湖无为市红庙35kV变电站新建工程",
|
||
"workContent": "混凝土、砂浆搅拌及浇筑,混凝土工程,安徽芜湖无为市红庙35kV变电站新建工程,场地平整,站区四通一平、站区道路工程,安徽芜湖无为市红庙35kV变电站新建工程,主体填充墙砌筑,砌筑工程,安徽芜湖无为市红庙35kV变电站新建工程,电缆沟砌筑,砖砌电缆沟,安徽芜湖无为市红庙35kV变电站新建工程,围墙工程施工,围墙工程,安徽芜湖无为市红庙35kV变电站新建工程,水电作业,水电工程,安徽芜湖无为市红庙35kV变电站新建工程,抹灰施工,抹灰工程,安徽芜湖无为市红庙35kV变电站新建工程,檩条及墙板安装,钢结构安装,安徽芜湖无为市红庙35kV变电站新建工程,暖通工程,暖通工程,安徽芜湖无为市红庙35kV变电站新建工程,开挖深度在3m以内的基坑挖土(不含3m),土方开挖,安徽芜湖无为市红庙35kV变电站新建工程,钢筋安装,钢筋工程,安徽芜湖无为市红庙35kV变电站新建工程,模板安拆,模板工程,安徽芜湖无为市红庙35kV变电站新建工程",
|
||
"foreman": "变电土建一班",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "117.791194",
|
||
"lat": "31.352704",
|
||
"workManage": "陈祥报",
|
||
"workManagePhone": "13195656757",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12C0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "横山-贺庄220kV线路工程",
|
||
"workContent": "钢筋绑扎安装作业,钢筋工程,GB1,钢筋绑扎安装作业,钢筋工程,GB2,混凝土浇筑作业,混凝土浇筑,GB1,混凝土浇筑作业,混凝土浇筑,GB2,一般土石方及掏挖基础机械开挖,一般土石方开挖,GB1,一般土石方及掏挖基础机械开挖,一般土石方开挖,GB2,开掘敷设和焊接回填,接地工程,GB1,开掘敷设和焊接回填,接地工程,GB2",
|
||
"foreman": "叶辉班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "117.854076",
|
||
"lat": "32.629004",
|
||
"workManage": "叶辉",
|
||
"workManagePhone": "13155412873",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12M0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "至德(东至)-政源220kV线路工程",
|
||
"workContent": "无人直升机展放导引绳,导引绳展放,G50-G67",
|
||
"foreman": "陈秋班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "116.900188",
|
||
"lat": "29.858521",
|
||
"workManage": "陈秋",
|
||
"workManagePhone": "18871808930",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12R0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "3",
|
||
"proName": "芜湖220kV黄浒变35kV配套送出架空线路工程",
|
||
"workContent": "导地线展放,导地线展放,G1,G10,G11,G12,G13,G14,G15,G16,G17,G18,G19,G2,G20,G21,G3,G4,G5,G6,G7,G8,G9,挂绝缘子及放线滑车,绝缘子挂设,G1,G10,G11,G12,G13,G14,G15,G16,G17,G18,G19,G2,G20,G21,G3,G4,G5,G6,G7,G8,G9,无人直升机展放导引绳,导引绳展放,G1,G10,G11,G12,G13,G14,G15,G16,G17,G18,G19,G2,G20,G21,G3,G4,G5,G6,G7,G8,G9,紧线、挂线作业,紧线、挂线作业,G1,G10,G11,G12,G13,G14,G15,G16,G17,G18,G19,G2,G20,G21,G3,G4,G5,G6,G7,G8,G9,人力展放导引绳,导引绳展放,G1,G10,G11,G12,G13,G14,G15,G16,G17,G18,G19,G2,G20,G21,G3,G4,G5,G6,G7,G8,G9,附件安装,杆塔附件安装,G1,G10,G11,G12,G13,G14,G15,G16,G17,G18,G19,G2,G20,G21,G3,G4,G5,G6,G7,G8,G9",
|
||
"foreman": "电气施工队",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "118.072221",
|
||
"lat": "31.051603",
|
||
"workManage": "宣荣武",
|
||
"workManagePhone": "15055304396",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12C0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "南屏-蓬莱路π入派河变电站110kV线路工程标段01",
|
||
"workContent": "机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,NB14,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,NB18,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,NB19,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,NB7,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,NB8,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,NC4,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,NC7,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,NC8,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,NC9,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,ND16,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,ND17,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,ND18,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,ND19",
|
||
"foreman": "潘登班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "117.177619",
|
||
"lat": "31.651932",
|
||
"workManage": "潘登",
|
||
"workManagePhone": "19805051231",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12A0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "亳州真源220kV变电站新建工程标段01",
|
||
"workContent": "接地网施工,接地网施工,亳州真源220kV变电站新建工程,设备支架及一般起重吊装,支架及其他吊装(通用于起重机吊装相关作业),亳州真源220kV变电站新建工程,母线桥及其附件安装,母线桥施工作业,亳州真源220kV变电站新建工程,电缆支架、电缆预埋管、电缆槽盒安装,电缆敷设及二次接线,亳州真源220kV变电站新建工程",
|
||
"foreman": "电气班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "116.200112",
|
||
"lat": "33.455364",
|
||
"workManage": "汪吉祥",
|
||
"workManagePhone": "13635626935",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12T0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "陂塘-撮镇π入龙泉变电站220kV架空线路工程标段01",
|
||
"workContent": "流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,A3、B3、A5、B5、A10、B10、A11、B11地面组装,吊车立塔、杆塔消缺",
|
||
"foreman": "张立敏",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "117.546954",
|
||
"lat": "31.846581",
|
||
"workManage": "张立敏",
|
||
"workManagePhone": "13866771905",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12A0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "元通-护桥220kV线路工程",
|
||
"workContent": "一般土石方及掏挖基础机械开挖,一般土石方开挖,#A11,一般土石方及掏挖基础机械开挖,一般土石方开挖,#A12,一般土石方及掏挖基础机械开挖,一般土石方开挖,#A14,一般土石方及掏挖基础机械开挖,一般土石方开挖,#A15,一般土石方及掏挖基础机械开挖,一般土石方开挖,#A6,混凝土浇筑作业,混凝土浇筑,#A11,混凝土浇筑作业,混凝土浇筑,#A12,混凝土浇筑作业,混凝土浇筑,#A14,混凝土浇筑作业,混凝土浇筑,#A15,混凝土浇筑作业,混凝土浇筑,#A6,开掘敷设和焊接回填,接地工程,#A11,开掘敷设和焊接回填,接地工程,#A12,开掘敷设和焊接回填,接地工程,#A14,开掘敷设和焊接回填,接地工程,#A15,开掘敷设和焊接回填,接地工程,#A6,钢筋绑扎安装作业,钢筋工程,#A11,钢筋绑扎安装作业,钢筋工程,#A12,钢筋绑扎安装作业,钢筋工程,#A14,钢筋绑扎安装作业,钢筋工程,#A15,钢筋绑扎安装作业,钢筋工程,#A6",
|
||
"foreman": "苏峰班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "118.91532",
|
||
"lat": "32.824553",
|
||
"workManage": "苏峰",
|
||
"workManagePhone": "15178021588",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12M0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "城郊青山35kV变电站新建工程",
|
||
"workContent": "道路施工,站区四通一平、站区道路工程,青山变电站,水电作业,水电工程,青山变电站,钢筋安装,钢筋工程,青山变电站,接地网施工,接地网施工,青山变电站,围墙工程施工,围墙工程,青山变电站,开挖深度在3m以内的基坑挖土(不含3m),土方开挖,青山变电站,混凝土作业,混凝土工程,青山变电站,模板安拆,模板工程,青山变电站",
|
||
"foreman": "土建班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "116.375678",
|
||
"lat": "31.552493",
|
||
"workManage": "陈春宝",
|
||
"workManagePhone": "18225850787",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12N0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "至德(东至)220kV变电站新建工程",
|
||
"workContent": "模板安拆,模板工程,池州至德(东至)220kV变电站新建工程,装饰装修作业,装饰装修工程,池州至德(东至)220kV变电站新建工程,场地平整,站区四通一平、站区道路工程,池州至德(东至)220kV变电站新建工程,开挖深度在3m以内的基坑挖土(不含3m),土方开挖,池州至德(东至)220kV变电站新建工程,钢筋安装,钢筋工程,池州至德(东至)220kV变电站新建工程,混凝土作业,混凝土工程,池州至德(东至)220kV变电站新建工程,消防设备,消防控制设备的安装,电缆敷设,消防设备和控制设备安装,至德(东至)220kV变电站新建工程",
|
||
"foreman": "倪阳阳班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "116.878583",
|
||
"lat": "30.091289",
|
||
"workManage": "倪阳阳",
|
||
"workManagePhone": "15077904221",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12R0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "香涧~钟阳π入头铺变电站220kV线路工程标段01",
|
||
"workContent": "流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,40#.43#.48#.,流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,A41,流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,A44,流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,A45,流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,A46",
|
||
"foreman": "唐勇班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "117.669034",
|
||
"lat": "33.095336",
|
||
"workManage": "唐勇",
|
||
"workManagePhone": "13982662805",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12L0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "合肥循环园220kV变电站新建工程标段01",
|
||
"workContent": "接地网施工,接地网施工,合肥循环园220kV变电站新建工程,钢筋安装,钢筋工程,合肥循环园220kV变电站新建工程,模板安拆,模板工程,合肥循环园220kV变电站新建工程,混凝土、砂浆搅拌及浇筑,混凝土工程,合肥循环园220kV变电站新建工程,场地平整,站区四通一平、站区道路工程,合肥循环园220kV变电站新建工程,开挖深度在3m以内的基坑挖土(不含3m),土方开挖,合肥循环园220kV变电站新建工程",
|
||
"foreman": "",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "117.475043",
|
||
"lat": "31.759703",
|
||
"workManage": "裴学龙",
|
||
"workManagePhone": "18756985251",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12A0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "黄山休宁兰渡35kV变电站新建工程标段01",
|
||
"workContent": "开挖深度在3m以内的基坑挖土(不含3m),土方开挖,黄山休宁兰渡35kV变电站新建工程,接地网施工,接地网施工,黄山休宁兰渡35kV变电站新建工程,抹灰施工,抹灰工程,黄山休宁兰渡35kV变电站新建工程,钢筋安装,钢筋工程,黄山休宁兰渡35kV变电站新建工程,混凝土、砂浆搅拌及浇筑,混凝土工程,黄山休宁兰渡35kV变电站新建工程,模板安拆,模板工程,黄山休宁兰渡35kV变电站新建工程,电缆沟砌筑,砖砌电缆沟,黄山休宁兰渡35kV变电站新建工程",
|
||
"foreman": "兰渡土建班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "118.129903",
|
||
"lat": "29.787453",
|
||
"workManage": "古宝柱",
|
||
"workManagePhone": "17696536515",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12S0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "芜湖双桥110kV变电站新建工程",
|
||
"workContent": "装饰装修作业,装饰装修工程,芜湖双桥110kV变电站新建工程,道路施工,站区四通一平、站区道路工程,芜湖双桥110kV变电站新建工程,混凝土作业,混凝土工程,芜湖双桥110kV变电站新建工程",
|
||
"foreman": "土建班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "118.608884",
|
||
"lat": "31.16507",
|
||
"workManage": "陶德海",
|
||
"workManagePhone": "18196581758",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12C0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "头铺220kV变电站新建工程标段01",
|
||
"workContent": "开挖深度在3m以内的基坑挖土(不含3m),土方开挖,头铺220kV变电站新建工程,模板安拆,模板工程,头铺220kV变电站新建工程,钢筋安装,钢筋工程,头铺220kV变电站新建工程,混凝土作业,混凝土工程,头铺220kV变电站新建工程,主体填充墙砌筑,砌筑工程,头铺220kV变电站新建工程,水电作业,水电工程,头铺220kV变电站新建工程,道路施工,站区四通一平、站区道路工程,头铺220kV变电站新建工程,场地平整,站区四通一平、站区道路工程,头铺220kV变电站新建工程,现浇式电缆沟施工,现浇式电缆沟施工,头铺220kV变电站新建工程,接地网施工,接地网施工,头铺220kV变电站新建工程,消防管道管网施工,消防管道管网施工,头铺220kV变电站新建工程",
|
||
"foreman": "土建班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "117.822977",
|
||
"lat": "33.112667",
|
||
"workManage": "何之倬",
|
||
"workManagePhone": "13955275215",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12L0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "宣城水西-大观110kV线路工程标段",
|
||
"workContent": "一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,A44,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,A45,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,A46,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,A47,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,A48,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,A49,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,A50,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,A51,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,A52#,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,A53#,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,A54#,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,A55#,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,AY1#",
|
||
"foreman": "跨越架",
|
||
"foremanPhone": null,
|
||
"ballStatus": "0",
|
||
"ballNo": null,
|
||
"lon": "118.315688",
|
||
"lat": "30.657093",
|
||
"workManage": "刘贤保",
|
||
"workManagePhone": "13337767919",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12G0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "文都-渡江、会宫-泉河π入古塘变电站220kV线路工程标段01",
|
||
"workContent": "人力、车辆或畜力运输(含栈桥搭设、拆除施工),工地运输,A15,人力、车辆或畜力运输(含栈桥搭设、拆除施工),工地运输,A16,人力、车辆或畜力运输(含栈桥搭设、拆除施工),工地运输,A19,人力、车辆或畜力运输(含栈桥搭设、拆除施工),工地运输,B15,人力、车辆或畜力运输(含栈桥搭设、拆除施工),工地运输,B18,人力、车辆或畜力运输(含栈桥搭设、拆除施工),工地运输,B19",
|
||
"foreman": "贺中林",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "117.264963",
|
||
"lat": "30.775887",
|
||
"workManage": "贺中林",
|
||
"workManagePhone": "18712338939",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12J0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "至德(东至)220kV变电站新建工程",
|
||
"workContent": "一次电气设备交接试验,电气调试试验,池州至德(东至)220kV变电站新建工程,二次设备调试,电气调试试验,至德(东至)220kV变电站新建工程,互感器、耦合电容器、避雷器安装,其他户外设备安装,至德(东至)220kV变电站新建工程,其它设备安装(主变中性设备等),其他户外设备安装,至德(东至)220kV变电站新建工程,电缆搬运、敷设二次接线,电缆敷设及二次接线,至德(东至)220kV变电站新建工程,接地网施工,接地网施工,池州至德(东至)220kV变电站新建工程,户外GIS就位、安装及充气,GIS组合电器安装,至德(东至)220kV变电站新建工程,软母线跳线、引下线、设备连线安装,软母线安装,至德(东至)220kV变电站新建工程,屏、柜、箱搬运、开箱及就位,开关柜、屏安装,至德(东至)220kV变电站新建工程,蓄电池安装及充放电,开关柜、屏安装,至德(东至)220kV变电站新建工程",
|
||
"foreman": "查取林班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "116.87894",
|
||
"lat": "30.09149",
|
||
"workManage": "查取林",
|
||
"workManagePhone": "13955609373",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12R0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "3",
|
||
"proName": "铜陵古塘220kV变电站新建工程标段01",
|
||
"workContent": "脚手架拆除作业,脚手架拆除,古塘变,开挖深度在3m以内的基坑挖土(不含3m),土方开挖,铜陵古塘220kV变电站新建工程,电缆沟砌筑,砖砌电缆沟,古塘变,模板安拆,模板工程,铜陵古塘220kV变电站新建工程,抹灰施工,抹灰工程,铜陵古塘220kV变电站新建工程,现浇式电缆沟施工,现浇式电缆沟施工,铜陵古塘220kV变电站新建工程,水电作业,水电工程,铜陵古塘220kV变电站新建工程,装饰装修作业,装饰装修工程,铜陵古塘220kV变电站新建工程,消防管道管网施工,消防管道管网施工,铜陵古塘220kV变电站新建工程,接地网施工,接地网施工,铜陵古塘220kV变电站新建工程,钢筋安装,钢筋工程,铜陵古塘220kV变电站新建工程,混凝土、砂浆搅拌及浇筑,混凝土工程,铜陵古塘220kV变电站新建工程,现浇式电缆沟施工,现浇式电缆沟施工,铜陵古塘220kV变电站新建工程",
|
||
"foreman": "杨志坤班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "117.273438",
|
||
"lat": "30.737395",
|
||
"workManage": "杨志坤",
|
||
"workManagePhone": "19877520038",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12J0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "六安白鹭110kV变电站新建工程",
|
||
"workContent": "檩条及墙板安装,钢结构安装,六安白鹭110kV变电站新建工程,钢结构地面加工、组装,钢结构安装,六安白鹭110kV变电站新建工程,装配式围墙施工,装配式围墙施工,六安白鹭110kV变电站新建工程,装饰装修作业,装饰装修工程,六安白鹭110kV变电站新建工程,彩板压制、安装,钢结构彩板安装,六安白鹭110kV变电站新建工程",
|
||
"foreman": "王苏徽班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "116.563634",
|
||
"lat": "31.831047",
|
||
"workManage": "王苏徽",
|
||
"workManagePhone": "18751835537",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12N0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "安庆四-涓桥500千伏线路工程(长江大跨越段)标段01",
|
||
"workContent": "机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,G17",
|
||
"foreman": "刘锐",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "117.216628",
|
||
"lat": "30.599833",
|
||
"workManage": "刘锐",
|
||
"workManagePhone": "18905620239",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12Z0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "安庆和平220千伏变电站新建工程",
|
||
"workContent": "软母线制作,软母线安装,和平变现场,户外GIS就位、安装及充气,GIS组合电器安装,和平变现场,电缆搬运、敷设二次接线,电缆敷设及二次接线,和平变现场,互感器、耦合电容器、避雷器安装,其他户外设备安装,和平变现场,其它设备安装(主变中性设备等),其他户外设备安装,和平变现场,母线桥及其附件安装,母线桥施工作业,和平变现场,接地网施工,接地网施工,和平变电站现场,屏、柜、箱搬运、开箱及就位,开关柜、屏安装,和平变现场",
|
||
"foreman": "李满义班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "116.833862",
|
||
"lat": "30.791266",
|
||
"workManage": "李满义",
|
||
"workManagePhone": "15256191199",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12D0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "板集电厂二期-原鹿500kV线路工程标段",
|
||
"workContent": "一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N1,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N10,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N100,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N101,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N11,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N117,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N118,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N12,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N126,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N127,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N13,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N164,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N165,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N166,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N167,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N168,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N169,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N170,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N171,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N172,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N173,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N2,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N3,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N4,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N5,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N6,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N7,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N8,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N9,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N93,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N94,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N95,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N96,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N97,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N98,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N99",
|
||
"foreman": "陈双双班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "0",
|
||
"ballNo": null,
|
||
"lon": "116.235276",
|
||
"lat": "32.865374",
|
||
"workManage": "陈双双",
|
||
"workManagePhone": "18796237665",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12Z0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "3",
|
||
"proName": "池州金峰110kV变电站1号主变扩建工程",
|
||
"workContent": "一次电气设备安装,改扩建施工,全站,110kV及以上高压电缆敷设,电缆敷设及二次接线,金峰变,软母线跳线、引下线、设备连线安装,软母线安装,全站,接地网施工,接地网施工,全站",
|
||
"foreman": "电气班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "118.015768",
|
||
"lat": "30.716041",
|
||
"workManage": "洪志保",
|
||
"workManagePhone": "13205661719",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12R0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "碱河-李楼110kV架空线路工程标段01",
|
||
"workContent": "一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,A1,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,A2,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,A3,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,A4,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,A5,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,A6,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,A7,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,A8,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,A9",
|
||
"foreman": "张柳班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "116.785535",
|
||
"lat": "33.931069",
|
||
"workManage": "张柳",
|
||
"workManagePhone": "15298773222",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12P0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "亳二~平圩(孔店)线路开断接入潘集变500千伏线路工程",
|
||
"workContent": "机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,A2-34",
|
||
"foreman": "杨中保班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "116.810951",
|
||
"lat": "32.844783",
|
||
"workManage": "杨中保",
|
||
"workManagePhone": "15855511358",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12Z0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": " 双岭-和平220千伏线路工程标段01",
|
||
"workContent": "挂绝缘子及放线滑车,绝缘子挂设,B25 #,挂绝缘子及放线滑车,绝缘子挂设,B26,挂绝缘子及放线滑车,绝缘子挂设,B27,挂绝缘子及放线滑车,绝缘子挂设,B28,挂绝缘子及放线滑车,绝缘子挂设,B29,挂绝缘子及放线滑车,绝缘子挂设,B30,挂绝缘子及放线滑车,绝缘子挂设,B31,挂绝缘子及放线滑车,绝缘子挂设,B32,挂绝缘子及放线滑车,绝缘子挂设,B33,挂绝缘子及放线滑车,绝缘子挂设,B34,挂绝缘子及放线滑车,绝缘子挂设,B35,挂绝缘子及放线滑车,绝缘子挂设,B36,挂绝缘子及放线滑车,绝缘子挂设,B37,挂绝缘子及放线滑车,绝缘子挂设,B38,挂绝缘子及放线滑车,绝缘子挂设,B39,挂绝缘子及放线滑车,绝缘子挂设,B40,挂绝缘子及放线滑车,绝缘子挂设,B41,挂绝缘子及放线滑车,绝缘子挂设,B42,挂绝缘子及放线滑车,绝缘子挂设,B43,挂绝缘子及放线滑车,绝缘子挂设,B44,挂绝缘子及放线滑车,绝缘子挂设,B45,挂绝缘子及放线滑车,绝缘子挂设,B46,挂绝缘子及放线滑车,绝缘子挂设,B47,挂绝缘子及放线滑车,绝缘子挂设,B48,挂绝缘子及放线滑车,绝缘子挂设,B49,挂绝缘子及放线滑车,绝缘子挂设,B50,人力展放导引绳,导引绳展放,B25 #,人力展放导引绳,导引绳展放,B26,人力展放导引绳,导引绳展放,B27,人力展放导引绳,导引绳展放,B28,人力展放导引绳,导引绳展放,B29,人力展放导引绳,导引绳展放,B30,人力展放导引绳,导引绳展放,B31,人力展放导引绳,导引绳展放,B32,人力展放导引绳,导引绳展放,B33,人力展放导引绳,导引绳展放,B34,人力展放导引绳,导引绳展放,B35,人力展放导引绳,导引绳展放,B36,人力展放导引绳,导引绳展放,B37,人力展放导引绳,导引绳展放,B38,人力展放导引绳,导引绳展放,B39,人力展放导引绳,导引绳展放,B40,人力展放导引绳,导引绳展放,B41,人力展放导引绳,导引绳展放,B42,人力展放导引绳,导引绳展放,B43,人力展放导引绳,导引绳展放,B44,人力展放导引绳,导引绳展放,B45,人力展放导引绳,导引绳展放,B46,人力展放导引绳,导引绳展放,B47,人力展放导引绳,导引绳展放,B48,人力展放导引绳,导引绳展放,B49,人力展放导引绳,导引绳展放,B50",
|
||
"foreman": "夏则微班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "116.911822",
|
||
"lat": "30.707721",
|
||
"workManage": "夏则微",
|
||
"workManagePhone": "18756563157",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12D0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "宿州黄岗110kV变电站新建工程标段01",
|
||
"workContent": "混凝土作业,混凝土工程,黄岗变施工现场,水电作业,水电工程,宿州黄岗110kV变电站新建工程,设备支架及一般起重吊装,支架及其他吊装(通用于起重机吊装相关作业),宿州黄岗110kV变电站新建工程,道路施工,站区四通一平、站区道路工程,宿州黄岗110kV变电站新建工程,钢筋安装,钢筋工程,黄岗变施工现场,现浇式电缆沟施工,现浇式电缆沟施工,宿州黄岗110kV变电站新建工程,接地网施工,接地网施工,宿州黄岗110kV变电站新建工程,主体填充墙砌筑,砌筑工程,宿州黄岗110kV变电站新建工程,开挖深度在3m以内的基坑挖土(不含3m),土方开挖,黄岗变施工现场,模板安拆,模板工程,黄岗变施工现场",
|
||
"foreman": "莫忠友土建班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "117.579754",
|
||
"lat": "33.547111",
|
||
"workManage": "莫忠友",
|
||
"workManagePhone": "15156817888",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12Q0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "桓谭-马庄π入、碱河-马庄(T接学院)改接入开渠变电站110kV电缆线路工程标段01",
|
||
"workContent": "防水施工、防水保护层施工,主体结构施工,D3,分层回填夯实,沟槽回填,D3,安装电缆支架和爬梯,附属工程施工,D3,接地极、接地线安装,附属工程施工,D3,深度小于5m深基槽开挖及支护,沟槽开挖,D3",
|
||
"foreman": "徐林班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "116.830163",
|
||
"lat": "33.970488",
|
||
"workManage": "徐林",
|
||
"workManagePhone": "15856183873",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12P0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "3",
|
||
"proName": "晴岚220千伏变电站220千伏安庆间隔扩建工程",
|
||
"workContent": "二次电气设备安装,改扩建施工,晴岚变220kV区域,互感器、耦合电容器、避雷器安装,其他户外设备安装,晴岚变220kV区,一次电气设备交接试验,电气调试试验,晴岚变220kV区域,材料、设备搬运、绿化、地面卫生清扫,改扩建施工,晴岚变220kV区,二次设备调试,电气调试试验,晴岚变220kV区,屏、柜、箱搬运、开箱及就位,开关柜、屏安装,晴岚变220kV区,断路器搬运、开箱、安装及充气,断路器安装,晴岚变220kV区,隔离开关安装、调整,隔离开关安装与调整,晴岚变220kV区域,软母线跳线、引下线、设备连线安装,软母线安装,晴岚变220kV区域,电缆搬运、敷设二次接线,电缆敷设及二次接线,晴岚变220kV区,接地网施工,接地网施工,晴岚变220kV区域",
|
||
"foreman": "电气班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "116.930119",
|
||
"lat": "30.531986",
|
||
"workManage": "王绪伟",
|
||
"workManagePhone": "18726290722",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12D0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "蟠龙-夏邱π入濉河变电站110kV线路工程标段01",
|
||
"workContent": "一般土石方及掏挖基础机械开挖,一般土石方开挖,B1,一般土石方及掏挖基础机械开挖,一般土石方开挖,B2,一般土石方及掏挖基础机械开挖,一般土石方开挖,B23,一般土石方及掏挖基础机械开挖,一般土石方开挖,B4,一般土石方及掏挖基础机械开挖,一般土石方开挖,B5,开掘敷设和焊接回填,接地工程,B1,开掘敷设和焊接回填,接地工程,B2,开掘敷设和焊接回填,接地工程,B23,开掘敷设和焊接回填,接地工程,B4,开掘敷设和焊接回填,接地工程,B5,钢筋绑扎安装作业,钢筋工程,B1,钢筋绑扎安装作业,钢筋工程,B2,钢筋绑扎安装作业,钢筋工程,B23,钢筋绑扎安装作业,钢筋工程,B4,钢筋绑扎安装作业,钢筋工程,B5,混凝土浇筑作业,混凝土浇筑,B1,混凝土浇筑作业,混凝土浇筑,B2,混凝土浇筑作业,混凝土浇筑,B23,混凝土浇筑作业,混凝土浇筑,B4,混凝土浇筑作业,混凝土浇筑,B5",
|
||
"foreman": "岳云峰班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "117.8441",
|
||
"lat": "33.478221",
|
||
"workManage": "岳云峰",
|
||
"workManagePhone": "15955452799",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12Q0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "蚌埠安东110kV变电站新建工程标段01",
|
||
"workContent": "装配式围墙施工,装配式围墙施工,蚌埠安东110kV变电站新建工程,钢结构地面加工、组装,钢结构安装,蚌埠安东110kV变电站新建工程,水电作业,水电工程,蚌埠安东110kV变电站新建工程",
|
||
"foreman": "钢结构",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "117.567723",
|
||
"lat": "32.857165",
|
||
"workManage": "鲁作明",
|
||
"workManagePhone": "13962500343",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12L0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "芜湖江北220kV变电站新建工程",
|
||
"workContent": "接地网施工,接地网施工,江北变,混凝土作业,混凝土工程,江北变,开挖深度在3m以内的基坑挖土(不含3m),土方开挖,江北变,模板安拆,模板工程,江北变,主体填充墙砌筑,砌筑工程,江北变,钢筋安装,钢筋工程,江北变",
|
||
"foreman": "朱玉保班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "118.284899",
|
||
"lat": "31.374438",
|
||
"workManage": "朱玉保",
|
||
"workManagePhone": "13865670482",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12C0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "文都-渡江、会宫-泉河π入古塘变电站220kV线路工程标段01",
|
||
"workContent": "流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,A20,流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,A23",
|
||
"foreman": "纪小龙班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "117.265561",
|
||
"lat": "30.76275",
|
||
"workManage": "纪小龙",
|
||
"workManagePhone": "15205574472",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12J0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "马鞍山苍山220kV变电站新建工程",
|
||
"workContent": "设备支架及一般起重吊装,支架及其他吊装(通用于起重机吊装相关作业),苍山变电站内,变压器.电抗器安装(油浸/不吊罩),油浸电力变压器.油浸电抗器施工作业,苍山变电站内,户外GIS就位、安装及充气,GIS组合电器安装,苍山变电站内,接地网施工,接地网施工,苍山变电站内,电缆支架、电缆预埋管、电缆槽盒安装,电缆敷设及二次接线,苍山变电站内,电缆搬运、敷设二次接线,电缆敷设及二次接线,苍山变电站内,屏、柜、箱搬运、开箱及就位,开关柜、屏安装,苍山变电站内,互感器、耦合电容器、避雷器安装,其他户外设备安装,苍山变电站内",
|
||
"foreman": "卓全利班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "118.155766",
|
||
"lat": "31.755229",
|
||
"workManage": "卓全利",
|
||
"workManagePhone": "15556202683",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12B0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "头铺220kV变电站新建工程标段01",
|
||
"workContent": "接地网施工,接地网施工,头铺220kV变电站新建工程,构架、横梁拼装,构架拼装、吊装,头铺220kV变电站新建工程",
|
||
"foreman": "王正东班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "117.822574",
|
||
"lat": "33.112604",
|
||
"workManage": "王正东",
|
||
"workManagePhone": "13865178265",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12L0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "昭关-苍山220kV线路工程",
|
||
"workContent": "一般土石方及掏挖基础机械开挖,一般土石方开挖,A37,一般土石方及掏挖基础机械开挖,一般土石方开挖,A38,一般土石方及掏挖基础机械开挖,一般土石方开挖,A40,一般土石方及掏挖基础机械开挖,一般土石方开挖,A48,一般土石方及掏挖基础机械开挖,一般土石方开挖,A51,一般土石方及掏挖基础机械开挖,一般土石方开挖,A52,一般土石方及掏挖基础机械开挖,一般土石方开挖,A53,一般土石方及掏挖基础机械开挖,一般土石方开挖,A7,钢筋绑扎安装作业,钢筋工程,A37,钢筋绑扎安装作业,钢筋工程,A38,钢筋绑扎安装作业,钢筋工程,A40,钢筋绑扎安装作业,钢筋工程,A48,钢筋绑扎安装作业,钢筋工程,A51,钢筋绑扎安装作业,钢筋工程,A52,钢筋绑扎安装作业,钢筋工程,A53,钢筋绑扎安装作业,钢筋工程,A7,混凝土浇筑作业,混凝土浇筑,A37,混凝土浇筑作业,混凝土浇筑,A38,混凝土浇筑作业,混凝土浇筑,A40,混凝土浇筑作业,混凝土浇筑,A48,混凝土浇筑作业,混凝土浇筑,A51,混凝土浇筑作业,混凝土浇筑,A52,混凝土浇筑作业,混凝土浇筑,A53,混凝土浇筑作业,混凝土浇筑,A7,开掘敷设和焊接回填,接地工程,A37,开掘敷设和焊接回填,接地工程,A38,开掘敷设和焊接回填,接地工程,A40,开掘敷设和焊接回填,接地工程,A48,开掘敷设和焊接回填,接地工程,A51,开掘敷设和焊接回填,接地工程,A52,开掘敷设和焊接回填,接地工程,A53,开掘敷设和焊接回填,接地工程,A7",
|
||
"foreman": "土建三班",
|
||
"foremanPhone": null,
|
||
"ballStatus": "0",
|
||
"ballNo": null,
|
||
"lon": "118.149418",
|
||
"lat": "31.767799",
|
||
"workManage": "段宝强",
|
||
"workManagePhone": "15852195632",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12B0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "阜四500kV变电站新建工程",
|
||
"workContent": "装配式围墙施工,装配式围墙施工,安徽阜阳阜四500千伏变电站工程,檩条及墙板安装,钢结构安装,主控通信室,檩条及墙板安装,钢结构安装,消防泵房及水池,檩条及墙板安装,钢结构安装,警卫室",
|
||
"foreman": "钢结构班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "115.391296",
|
||
"lat": "32.948818",
|
||
"workManage": "吴其进",
|
||
"workManagePhone": "15055673182",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12Z0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "3",
|
||
"proName": "文都-渡江、会宫-泉河π入古塘变电站220kV线路工程标段01",
|
||
"workContent": "内悬浮外拉线抱杆分解组塔,角钢塔(钢管塔)施工,A13,B13",
|
||
"foreman": "张宏韬班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "117.261442",
|
||
"lat": "30.785734",
|
||
"workManage": "张宏韬",
|
||
"workManagePhone": "18269792519",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12J0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "四清35kv变电站新建工程标段01",
|
||
"workContent": "电缆搬运、敷设二次接线,电缆敷设及二次接线,涡阳县四清35kV变电站新建工程,一次电气设备交接试验,电气调试试验,涡阳县四清35kV变电站新建工程,二次设备调试,电气调试试验,涡阳县四清35kV变电站新建工程",
|
||
"foreman": "解金矿电气班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "116.068705",
|
||
"lat": "33.691084",
|
||
"workManage": "解金矿",
|
||
"workManagePhone": "18856068610",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12T0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "宿州永镇110kV变电站新建工程标段01",
|
||
"workContent": "蓄电池安装及充放电,开关柜、屏安装,永镇变,屏、柜、箱搬运、开箱及就位,开关柜、屏安装,全站,接地网施工,接地网施工,设备材料卸货,电缆搬运、敷设二次接线,电缆敷设及二次接线,变电站内,110kV及以上高压电缆敷设,电缆敷设及二次接线,永镇变,变压器.电抗器安装(油浸/不吊罩),油浸电力变压器.油浸电抗器施工作业,全站,互感器、耦合电容器、避雷器安装,其他户外设备安装,电容器区,户外GIS就位、安装及充气,GIS组合电器安装,全站,母线桥及其附件安装,母线桥施工作业,全站,一次电气设备交接试验,电气调试试验,全站",
|
||
"foreman": "赵威电气班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "117.019733",
|
||
"lat": "33.372345",
|
||
"workManage": "赵威",
|
||
"workManagePhone": "13487711458",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12Q0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "3",
|
||
"proName": "昭关-苍山220kV线路工程",
|
||
"workContent": "内悬浮外拉线抱杆分解组塔,角钢塔(钢管塔)施工,A29",
|
||
"foreman": "王小军班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "118.062379",
|
||
"lat": "31.707405",
|
||
"workManage": "王小军",
|
||
"workManagePhone": "15091456042",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12B0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "3",
|
||
"proName": "芜湖后港220kV变电站2号主变扩建工程",
|
||
"workContent": "一次电气设备安装,改扩建施工,站内,接地网施工,接地网施工,站内3,改扩建工程二次设备试验,电气调试试验,站内,改扩建工程一次设备试验,电气调试试验,站内,材料、设备搬运、绿化、地面卫生清扫,改扩建施工,站内,变电站验收、消缺作业,投产送电,站内4,软母线跳线、引下线、设备连线安装,软母线安装,站内,电缆搬运、敷设二次接线,电缆敷设及二次接线,站内,屏、柜、箱搬运、开箱及就位,开关柜、屏安装,站内",
|
||
"foreman": "",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "118.343659",
|
||
"lat": "30.943452",
|
||
"workManage": "史明星",
|
||
"workManagePhone": "15605510085",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12C0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "板集电厂二期-原鹿500kV线路工程标段",
|
||
"workContent": "一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业, N120,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N1,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N10,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N100,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N101,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N11,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N114,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N115,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N116,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N117,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N118,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N119,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N12,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N126,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N127,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N128,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N129,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N13,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N130,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N131,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N132,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N133,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N134,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N135,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N136,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N137,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N138,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N139,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N140,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N141,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N142,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N143,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N144,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N145,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N146,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N147,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N148,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N149,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N150,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N151,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N152,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N153,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N154,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N155,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N156,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N157,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N158,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N159,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N160,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N161,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N162,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N163,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N164,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N165,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N166,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N167,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N168,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N169,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N170,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N171,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N172,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N173,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N2,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N3,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N4,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N5,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N6,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N7,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N8,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N9,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N93,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N94,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N95,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N96,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N97,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N98,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,N99",
|
||
"foreman": "孔亚康班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "0",
|
||
"ballNo": null,
|
||
"lon": "116.001033",
|
||
"lat": "32.730641",
|
||
"workManage": "孔亚康",
|
||
"workManagePhone": "18036015892",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12Z0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "派河220kV变电站新建工程标段01",
|
||
"workContent": "户外GIS就位、安装及充气,GIS组合电器安装,派河220kV变电站新建工程,电缆搬运、敷设二次接线,电缆敷设及二次接线,派河220kV变电站新建工程,消防管道管网施工,消防管道管网施工,派河220kV变电站新建工程,接地网施工,接地网施工,派河220kV变电站新建工程,其它设备安装(主变中性设备等),其他户外设备安装,派河220kV变电站新建工程,互感器、耦合电容器、避雷器安装,其他户外设备安装,派河220kV变电站新建工程,站用变、消弧线圈、二次设备仓安装,其他户外设备安装,派河220kV变电站新建工程,设备支架及一般起重吊装,支架及其他吊装(通用于起重机吊装相关作业),派河220kV变电站新建工程,屏、柜、箱搬运、开箱及就位,开关柜、屏安装,派河220kV变电站新建工程",
|
||
"foreman": "方伟班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "117.178011",
|
||
"lat": "31.651756",
|
||
"workManage": "方伟",
|
||
"workManagePhone": "18156212280",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12A0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "蚌埠龚王110kV变电站新建工程标段01",
|
||
"workContent": "接地网施工,接地网施工,蚌埠龚王110kV变电站新建工程,装配式防火墙施工,装配式防火墙施工,蚌埠龚王110kV变电站新建工程,围墙工程施工,围墙工程,蚌埠龚王110kV变电站新建工程,水电作业,水电工程,蚌埠龚王110kV变电站新建工程,装饰装修作业,装饰装修工程,蚌埠龚王110kV变电站新建工程,檩条及墙板安装,钢结构安装,蚌埠龚王110kV变电站新建工程",
|
||
"foreman": "钢结构刘郭平班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "117.233718",
|
||
"lat": "33.000621",
|
||
"workManage": "刘郭平",
|
||
"workManagePhone": "13645604616",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12L0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "孔店~龙门500千伏线路增容改造工程",
|
||
"workContent": "流动式起重机立塔(塔高60米以上),角钢塔(钢管塔)施工,G72",
|
||
"foreman": "尹成全组塔架线班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "117.117019",
|
||
"lat": "32.332912",
|
||
"workManage": "尹成全",
|
||
"workManagePhone": "13909039162",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12Z0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "洛河~汤庄、洛河~平圩500千伏线路改接工程",
|
||
"workContent": "一般土石方及掏挖基础机械开挖,一般土石方开挖,C1-1,一般土石方及掏挖基础机械开挖,一般土石方开挖,C1-2,一般土石方及掏挖基础机械开挖,一般土石方开挖,C1-5,钢筋绑扎安装作业,钢筋工程,C1-1,钢筋绑扎安装作业,钢筋工程,C1-2,钢筋绑扎安装作业,钢筋工程,C1-5,混凝土浇筑作业,混凝土浇筑,C1-1,混凝土浇筑作业,混凝土浇筑,C1-2,混凝土浇筑作业,混凝土浇筑,C1-5,开掘敷设和焊接回填,接地工程,C1-1,开掘敷设和焊接回填,接地工程,C1-2,开掘敷设和焊接回填,接地工程,C1-5",
|
||
"foreman": "徐基山班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "116.755869",
|
||
"lat": "32.772998",
|
||
"workManage": "徐基山",
|
||
"workManagePhone": "13170203308",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12Z0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "青春开关站-定远东牵引站220千伏线路工程",
|
||
"workContent": "混凝土浇筑作业,混凝土浇筑,AT9,钢筋绑扎安装作业,钢筋工程,AT9,一般土石方及掏挖基础机械开挖,一般土石方开挖,AT9,开掘敷设和焊接回填,接地工程,AT9",
|
||
"foreman": "潘小雨班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "117.777242",
|
||
"lat": "32.515991",
|
||
"workManage": "潘小雨",
|
||
"workManagePhone": "18326209925",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12M0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "马鞍山苍山220kV变电站新建工程",
|
||
"workContent": "装配式围墙施工,装配式围墙施工,苍山变电站内,钢结构地面加工、组装,钢结构安装,苍山变电站内,檩条及墙板安装,钢结构安装,苍山变电站内,彩板压制、安装,钢结构彩板安装,苍山变电站内",
|
||
"foreman": "钢结构班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "118.146806",
|
||
"lat": "31.752218",
|
||
"workManage": "刘宝",
|
||
"workManagePhone": "18256904187",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12B0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "龙门-卫田220kV线路工程标段01",
|
||
"workContent": "人力展放导引绳,导引绳展放,B10-B19放线准备 ,挂绝缘子滑车",
|
||
"foreman": "任家泉班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "117.200935",
|
||
"lat": "32.065436",
|
||
"workManage": "任家泉",
|
||
"workManagePhone": "18356131815",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12A0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "3",
|
||
"proName": "池州电厂二期-涓桥220kV线路工程",
|
||
"workContent": "钢筋及声测管绑扎安装作业(设计坑深大于等于5m的掏挖基础、设计坑深小于16m的人工挖孔桩基础等),钢筋工程,G38,G44",
|
||
"foreman": "二标一班",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "117.596598",
|
||
"lat": "30.65444",
|
||
"workManage": "于国民",
|
||
"workManagePhone": "13955872289",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12R0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "宣城日新110kV变电站新建工程",
|
||
"workContent": "模板安拆,模板工程,GIS基础,模板安拆,模板工程,主变及防火墙,模板安拆,模板工程,变电站内,模板安拆,模板工程,围墙及大门,模板安拆,模板工程,宣城日新110kV变电站新建工程,模板安拆,模板工程,室内外电缆沟,模板安拆,模板工程,构架基础,模板安拆,模板工程,电容器基础,模板安拆,模板工程,站内外道路,模板安拆,模板工程,辅助用房,模板安拆,模板工程,配电装置室,接地网施工,接地网施工,变电站内,主体填充墙砌筑,砌筑工程,GIS基础,主体填充墙砌筑,砌筑工程,主变及防火墙,主体填充墙砌筑,砌筑工程,变电站内,主体填充墙砌筑,砌筑工程,围墙及大门,主体填充墙砌筑,砌筑工程,宣城日新110kV变电站新建工程,主体填充墙砌筑,砌筑工程,室内外电缆沟,主体填充墙砌筑,砌筑工程,构架基础,主体填充墙砌筑,砌筑工程,电容器基础,主体填充墙砌筑,砌筑工程,站内外道路,主体填充墙砌筑,砌筑工程,辅助用房,主体填充墙砌筑,砌筑工程,配电装置室,混凝土作业,混凝土工程,GIS基础,混凝土作业,混凝土工程,主变及防火墙,混凝土作业,混凝土工程,变电站内,混凝土作业,混凝土工程,围墙及大门,混凝土作业,混凝土工程,宣城日新110kV变电站新建工程,混凝土作业,混凝土工程,室内外电缆沟,混凝土作业,混凝土工程,构架基础,混凝土作业,混凝土工程,电容器基础,混凝土作业,混凝土工程,站内外道路,混凝土作业,混凝土工程,辅助用房,混凝土作业,混凝土工程,配电装置室,钢筋安装,钢筋工程,GIS基础,钢筋安装,钢筋工程,主变及防火墙,钢筋安装,钢筋工程,变电站内,钢筋安装,钢筋工程,围墙及大门,钢筋安装,钢筋工程,宣城日新110kV变电站新建工程,钢筋安装,钢筋工程,室内外电缆沟,钢筋安装,钢筋工程,构架基础,钢筋安装,钢筋工程,电容器基础,钢筋安装,钢筋工程,站内外道路,钢筋安装,钢筋工程,辅助用房,钢筋安装,钢筋工程,配电装置室",
|
||
"foreman": "李翔班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "118.663112",
|
||
"lat": "30.944559",
|
||
"workManage": "李翔",
|
||
"workManagePhone": "13956996218",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12G0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "合肥二电厂-长临河π入循环园变电站220kV线路工程标段01",
|
||
"workContent": "机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,A1-A3 B1-B4 C4 灌注桩基础及承台施工 ",
|
||
"foreman": "刘告发班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "117.475597",
|
||
"lat": "31.756671",
|
||
"workManage": "刘告发",
|
||
"workManagePhone": "18056354395",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12A0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "陂塘-草庙乡牵引站220kV线路工程标段01",
|
||
"workContent": "一般土石方及掏挖基础机械开挖,一般土石方开挖,D3,D6,D10,D12,D13承台 。D27,D33,D55,D56,D57,D58,D64大开挖",
|
||
"foreman": "赵志超",
|
||
"foremanPhone": null,
|
||
"ballStatus": "0",
|
||
"ballNo": null,
|
||
"lon": "117.491558",
|
||
"lat": "31.917927",
|
||
"workManage": "赵志超",
|
||
"workManagePhone": "15256563663",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12A0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "独秀-金拱π入和平变电站110kV线路工程",
|
||
"workContent": "机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,B11,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,B12,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,B8",
|
||
"foreman": "基础班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "116.839519",
|
||
"lat": "30.781492",
|
||
"workManage": "李显国",
|
||
"workManagePhone": "13955699251",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12D0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "3",
|
||
"proName": "池州金峰110kV变电站1号主变扩建工程",
|
||
"workContent": "土建间隔扩建施工,改扩建施工,全站,开挖深度在3m以内的基坑挖土(不含3m),土方开挖,变电站全站,模板安拆,模板工程,全站,混凝土作业,混凝土工程,全站",
|
||
"foreman": "土建班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "0",
|
||
"ballNo": null,
|
||
"lon": "118.01535",
|
||
"lat": "30.717434",
|
||
"workManage": "徐毅",
|
||
"workManagePhone": "17505662220",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12R0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "池州电厂二期-涓桥220kV线路工程",
|
||
"workContent": "混凝土浇筑作业,混凝土浇筑,G77,混凝土浇筑作业,混凝土浇筑,G78,混凝土浇筑作业,混凝土浇筑,G99",
|
||
"foreman": "3标二班",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "117.426156",
|
||
"lat": "30.543737",
|
||
"workManage": "黄启川",
|
||
"workManagePhone": "17596988105",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12R0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "南屏-蓬莱路π入派河变电站110kV线路工程标段01",
|
||
"workContent": "钢筋绑扎安装作业,钢筋工程,NB9,钢筋绑扎安装作业,钢筋工程,NC11,钢筋绑扎安装作业,钢筋工程,ND11,钢筋绑扎安装作业,钢筋工程,ND14,钢筋绑扎安装作业,钢筋工程,ND9,一般土石方及掏挖基础机械开挖,一般土石方开挖,NB9,一般土石方及掏挖基础机械开挖,一般土石方开挖,NC11,一般土石方及掏挖基础机械开挖,一般土石方开挖,ND11,一般土石方及掏挖基础机械开挖,一般土石方开挖,ND14,一般土石方及掏挖基础机械开挖,一般土石方开挖,ND9,混凝土浇筑作业,混凝土浇筑,NB9,混凝土浇筑作业,混凝土浇筑,NC11,混凝土浇筑作业,混凝土浇筑,ND11,混凝土浇筑作业,混凝土浇筑,ND14,混凝土浇筑作业,混凝土浇筑,ND9,开掘敷设和焊接回填,接地工程,NB9,开掘敷设和焊接回填,接地工程,NC11,开掘敷设和焊接回填,接地工程,ND11,开掘敷设和焊接回填,接地工程,ND14,开掘敷设和焊接回填,接地工程,ND9",
|
||
"foreman": "闫晓号班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "117.186573",
|
||
"lat": "31.660843",
|
||
"workManage": "闫晓号",
|
||
"workManagePhone": "18712562759",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12A0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "滁州新河220kV变电站 新建工程",
|
||
"workContent": "钢结构地面加工、组装,钢结构安装,新河变,檩条及墙板安装,钢结构安装,新河变,装配式围墙施工,装配式围墙施工,新河变",
|
||
"foreman": "宋欣鹏",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "118.431242",
|
||
"lat": "32.377705",
|
||
"workManage": "宋欣鹏",
|
||
"workManagePhone": "18252116256",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12M0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "民安-江北220kV线路工程",
|
||
"workContent": "流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,M17,流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,M19,流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,M20,流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,M21,流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,M22,流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,M23,流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,M24,流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,M37,流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,M38,流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,M39,流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,M40,人力、车辆或畜力运输(含栈桥搭设、拆除施工),工地运输,M17,人力、车辆或畜力运输(含栈桥搭设、拆除施工),工地运输,M19,人力、车辆或畜力运输(含栈桥搭设、拆除施工),工地运输,M20,人力、车辆或畜力运输(含栈桥搭设、拆除施工),工地运输,M21,人力、车辆或畜力运输(含栈桥搭设、拆除施工),工地运输,M22,人力、车辆或畜力运输(含栈桥搭设、拆除施工),工地运输,M23,人力、车辆或畜力运输(含栈桥搭设、拆除施工),工地运输,M24,人力、车辆或畜力运输(含栈桥搭设、拆除施工),工地运输,M37,人力、车辆或畜力运输(含栈桥搭设、拆除施工),工地运输,M38,人力、车辆或畜力运输(含栈桥搭设、拆除施工),工地运输,M39,人力、车辆或畜力运输(含栈桥搭设、拆除施工),工地运输,M40",
|
||
"foreman": "尹乾前班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "118.23164",
|
||
"lat": "31.383585",
|
||
"workManage": "尹乾前",
|
||
"workManagePhone": "15348280020",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12C0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "宣城齐林(北三)110kV变电站新建工程",
|
||
"workContent": "模板安拆,模板工程,宣城北三110kV变电站新建工程,围墙工程施工,围墙工程,宣城齐林(北三)110kV变电站新建工程,高度<8m的挡土墙施工,站区四通一平、站区道路工程,宣城齐林(北三)110kV变电站新建工程,场地平整,站区四通一平、站区道路工程,宣城齐林(北三)110kV变电站新建工程,道路施工,站区四通一平、站区道路工程,宣城齐林(北三)110kV变电站新建工程,水电作业,水电工程,宣城齐林(北三)110kV变电站新建工程,开挖深度在3m以内的基坑挖土(不含3m),土方开挖,宣城北三110kV变电站新建工程,钢筋安装,钢筋工程,宣城北三110kV变电站新建工程,接地网施工,接地网施工,宣城齐林(北三)110kV变电站新建工程,现浇式电缆沟施工,现浇式电缆沟施工,宣城北三110kV变电站新建工程,混凝土作业,混凝土工程,宣城北三110kV变电站新建工程",
|
||
"foreman": "周宗成班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "118.69541",
|
||
"lat": "31.020885",
|
||
"workManage": "周宗成",
|
||
"workManagePhone": "18075005928",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12G0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "马鞍山叶家桥110千伏变电站新建工程",
|
||
"workContent": "电缆搬运、敷设二次接线,电缆敷设及二次接线,马鞍山叶家桥110千伏变电站新建工程,电缆支架、电缆预埋管、电缆槽盒安装,电缆敷设及二次接线,马鞍山叶家桥110千伏变电站新建工程,接地网施工,接地网施工,马鞍山叶家桥110千伏变电站新建工程,母线桥及其附件安装,母线桥施工作业,马鞍山叶家桥110千伏变电站新建工程,屏、柜、箱搬运、开箱及就位,开关柜、屏安装,马鞍山叶家桥110千伏变电站新建工程,蓄电池安装及充放电,开关柜、屏安装,马鞍山叶家桥110千伏变电站新建工程,站用变、消弧线圈、二次设备仓安装,其他户外设备安装,马鞍山叶家桥110千伏变电站新建工程,互感器、耦合电容器、避雷器安装,其他户外设备安装,马鞍山叶家桥110千伏变电站新建工程",
|
||
"foreman": "周贻上",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "118.776222",
|
||
"lat": "31.576963",
|
||
"workManage": "周贻上",
|
||
"workManagePhone": "15858448537",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12B0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "3",
|
||
"proName": "汪墩-马巷π入高皇变电站110kV线路工程",
|
||
"workContent": "导地线展放,导地线展放,E1#-E28#,紧线、挂线作业,紧线、挂线作业,E1#-E28#,杆塔螺栓复紧与消缺,角钢塔(钢管塔)施工,E1#-E28#,人力展放导引绳,导引绳展放,E1#-E28#,附件安装,杆塔附件安装,E1#-E28#,挂绝缘子及放线滑车,绝缘子挂设,E1#-E28#",
|
||
"foreman": "王健强班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "116.41951",
|
||
"lat": "31.812589",
|
||
"workManage": "王健强",
|
||
"workManagePhone": "17761151297",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12N0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "桓谭-马庄π入、碱河-马庄(T接学院)改接开渠变电站110kV架空线路工程标段01",
|
||
"workContent": "流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,N72",
|
||
"foreman": "丁宝龙班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "116.814813",
|
||
"lat": "33.970023",
|
||
"workManage": "丁宝龙",
|
||
"workManagePhone": "17709611632",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12P0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "西湖-临淮Ⅰ线T接、西湖-临淮Ⅱ线改接双河变电站35kV架空线路工程",
|
||
"workContent": "机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,#19,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,#20,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,#21,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,#22,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,#23,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,#24,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,#25,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,#26,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,#27,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,#28,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,#29,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,#30,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,#31,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,#5,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,#6",
|
||
"foreman": "土建",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "116.274672",
|
||
"lat": "32.426003",
|
||
"workManage": "胡远亭",
|
||
"workManagePhone": "18756428343",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12N0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "桓谭-马庄π入、碱河-马庄(T接学院)改接开渠变电站110kV架空线路工程标段01",
|
||
"workContent": "杆塔螺栓复紧与消缺,角钢塔(钢管塔)施工,N1,杆塔螺栓复紧与消缺,角钢塔(钢管塔)施工,N2,杆塔螺栓复紧与消缺,角钢塔(钢管塔)施工,N3",
|
||
"foreman": "刘虎班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "0",
|
||
"ballNo": null,
|
||
"lon": "116.913391",
|
||
"lat": "33.963312",
|
||
"workManage": "刘虎",
|
||
"workManagePhone": "15756137616",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12P0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "安庆四-涓桥500千伏线路工程(一般线路段)标段01",
|
||
"workContent": "机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,G31",
|
||
"foreman": "夏有康班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "117.281513",
|
||
"lat": "30.598522",
|
||
"workManage": "夏有康",
|
||
"workManagePhone": "13865212680",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12Z0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "苏埠-武陟山π入高皇变电站110kV线路工程",
|
||
"workContent": "人力、车辆或畜力运输(含栈桥搭设、拆除施工),工地运输,C1#、C31#、C32#、C33#、新建#1、新建#2,人力、车辆或畜力运输(含栈桥搭设、拆除施工),工地运输,C21#-C38#-改1#-改2#-改3#,杆塔螺栓复紧与消缺,角钢塔(钢管塔)施工,C1#-C38#-改1#-改2#-改3#,流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,C1#-C38#-改1#-改2#-改3#",
|
||
"foreman": "代德才班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "116.390364",
|
||
"lat": "31.800862",
|
||
"workManage": "代德才",
|
||
"workManagePhone": "19956406981",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12N0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "民安-江北220kV线路工程",
|
||
"workContent": "钢筋加工,钢筋工程,M18,混凝土浇筑作业,混凝土浇筑,M18,开掘敷设和焊接回填,接地工程,M18,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,M18",
|
||
"foreman": "徐钦文班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "118.240325",
|
||
"lat": "31.389634",
|
||
"workManage": "徐钦文",
|
||
"workManagePhone": "13866595284",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12C0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "亳州真源220kV变电站新建工程标段01",
|
||
"workContent": "接地网施工,接地网施工,亳州真源220kV变电站新建工程,设备支架及一般起重吊装,支架及其他吊装(通用于起重机吊装相关作业),亳州真源220kV变电站新建工程,电缆支架、电缆预埋管、电缆槽盒安装,电缆敷设及二次接线,亳州真源220kV变电站新建工程",
|
||
"foreman": "电气班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "116.203097",
|
||
"lat": "33.457665",
|
||
"workManage": "汪吉祥",
|
||
"workManagePhone": "13635626935",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12T0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "3",
|
||
"proName": "安徽亳州蒙城县柳林-乐土35kv架空线路工程",
|
||
"workContent": "导地线展放,导地线展放,#31,#32,#33,#34,#35,#36,#30,人力展放导引绳,导引绳展放,#31,#32,#33,#34,#35,#36,#30,紧线、挂线作业,紧线、挂线作业,#31,#32,#33,#34,#35,#36,#30,附件安装,杆塔附件安装,#31,#32,#33,#34,#35,#36,#18,#19,#20,#21,#22,#23,#24,#25,#26,#27,#28,#29,#30,挂绝缘子及放线滑车,绝缘子挂设,#31,#32,#33,#34,#35,#36,#30",
|
||
"foreman": "史兆旺班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "116.608421",
|
||
"lat": "33.134239",
|
||
"workManage": "史兆旺",
|
||
"workManagePhone": "18895527200",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12T0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "牌坊~陂塘π入袁河西路110kV电缆线路工程标段01",
|
||
"workContent": "开挖深度在3m以内的基坑挖土(不含3m),土方开挖,牌坊-陂塘π入袁河西路110kV电缆线路工程 沟槽开挖、砖砌体工程、钢筋绑扎、模板安装、混凝土浇筑、土方回填",
|
||
"foreman": "电缆班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "117.467081",
|
||
"lat": "31.903644",
|
||
"workManage": "许克",
|
||
"workManagePhone": "15138432536",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12A0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "滁州新河220kV变电站 新建工程",
|
||
"workContent": "模板安拆,模板工程,新河变,电缆沟砌筑,砖砌电缆沟,新河变,钢筋安装,钢筋工程,新河变,抹灰施工,抹灰工程,新河变,混凝土作业,混凝土工程,新河变,水电作业,水电工程,新河变,开挖深度在3m以内的基坑挖土(不含3m),土方开挖,新河变,接地网施工,接地网施工,新河变",
|
||
"foreman": "张超",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "118.431331",
|
||
"lat": "32.378024",
|
||
"workManage": "黄昌成",
|
||
"workManagePhone": "18119636866",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12M0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "定远-鲁肃220千伏线路工程",
|
||
"workContent": "钢筋绑扎安装作业,钢筋工程,CT48,开掘敷设和焊接回填,接地工程,CT48,混凝土浇筑作业,混凝土浇筑,CT48,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,CT48",
|
||
"foreman": "蒋花香",
|
||
"foremanPhone": null,
|
||
"ballStatus": "0",
|
||
"ballNo": null,
|
||
"lon": "117.67412",
|
||
"lat": "32.481873",
|
||
"workManage": "蒋花香",
|
||
"workManagePhone": "13721138908",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12M0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "庞营、潘寨改接入流鞍河变电站110kV电缆线路工程",
|
||
"workContent": "110kV及以上高压电缆敷设,电缆敷设及二次接线,C1电缆井,110kV及以上高压电缆敷设,电缆敷设及二次接线,D1电缆井,110kV及以上高压电缆敷设,电缆敷设及二次接线,流鞍河变电站站内,110kV及以上高压电缆头制作,电缆敷设及二次接线,C1电缆井,110kV及以上高压电缆头制作,电缆敷设及二次接线,D1电缆井,110kV及以上高压电缆头制作,电缆敷设及二次接线,流鞍河变电站站内,电缆登塔/引上敷设,电缆敷设施工,C1电缆井,电缆登塔/引上敷设,电缆敷设施工,D1电缆井,电缆登塔/引上敷设,电缆敷设施工,流鞍河变电站站内,电缆核相,电缆停(送)电施工,C1电缆井,电缆核相,电缆停(送)电施工,D1电缆井,电缆核相,电缆停(送)电施工,流鞍河变电站站内",
|
||
"foreman": "姚德社班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "0",
|
||
"ballNo": null,
|
||
"lon": "115.230304",
|
||
"lat": "33.052435",
|
||
"workManage": "姚德社",
|
||
"workManagePhone": "18956533739",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12H0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "迎仙110kV变电站新建工程",
|
||
"workContent": "互感器、耦合电容器、避雷器安装,其他户外设备安装,迎仙110kV变电站,其它设备安装(主变中性设备等),其他户外设备安装,迎仙变电站,母线桥及其附件安装,母线桥施工作业,迎仙110kV变电站,户外GIS就位、安装及充气,GIS组合电器安装,迎仙110kV变电站,电缆搬运、敷设二次接线,电缆敷设及二次接线,迎仙变,一次电气设备交接试验,电气调试试验,迎仙110kV变电站,二次设备调试,电气调试试验,迎仙110kV变电站新建工程,屏、柜、箱搬运、开箱及就位,开关柜、屏安装,迎仙110kV变电站,软母线跳线、引下线、设备连线安装,软母线安装,迎仙变",
|
||
"foreman": "电气班组-杜新虎",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "115.157475",
|
||
"lat": "32.928454",
|
||
"workManage": "杜新虎",
|
||
"workManagePhone": "18365289304",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12H0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "高皇220kV变电站新建工程",
|
||
"workContent": "软母线跳线、引下线、设备连线安装,软母线安装,高皇220kV变电站新建工程,二次设备调试,电气调试试验,高皇220kV变电站新建工程,一次电气设备交接试验,电气调试试验,高皇220kV变电站新建工程,屏、柜、箱搬运、开箱及就位,开关柜、屏安装,高皇220kV变电站新建工程,电缆搬运、敷设二次接线,电缆敷设及二次接线,高皇220kV变电站新建工程,其它设备安装(主变中性设备等),其他户外设备安装,高皇220kV变电站新建工程,户外GIS就位、安装及充气,GIS组合电器安装,高皇220kV变电站新建工程,接地网施工,接地网施工,高皇220kV变电站新建工程,母线桥及其附件安装,母线桥施工作业,高皇220kV变电站新建工程",
|
||
"foreman": "电气班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "116.397983",
|
||
"lat": "31.808457",
|
||
"workManage": "常征",
|
||
"workManagePhone": "18355852863",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12N0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "3",
|
||
"proName": "板集电厂二期-原鹿500kV线路工程标段",
|
||
"workContent": "紧线、挂线作业,紧线、挂线作业,N155,N157,导地线展放,导地线展放,N151,N152,N153,N154,N155,N156,N157,N158,N159,N160,N161,N162,N163,N164,人力展放导引绳,导引绳展放,N151,N152,N153,N154,N155,N156,N157,N158,N159,N160,N161,N162,N163,N164",
|
||
"foreman": "线路二班",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "115.918419",
|
||
"lat": "32.696903",
|
||
"workManage": "殷书尔",
|
||
"workManagePhone": "13855677903",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12Z0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "3",
|
||
"proName": "和平-邓村220千伏线路工程标段01",
|
||
"workContent": "紧线、挂线作业,紧线、挂线作业,A40,A41,A42,A43,A44,A45,A46,A47",
|
||
"foreman": "徐强",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "116.945894",
|
||
"lat": "30.789359",
|
||
"workManage": "徐强",
|
||
"workManagePhone": "18227996837",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12D0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "3",
|
||
"proName": "庞营、潘寨改接入流鞍河变电站110kV架空线路工程",
|
||
"workContent": "流动式起重机立塔(塔高60米以上),角钢塔(钢管塔)施工,C3,流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,C4,C6,杆塔螺栓复紧与消缺,角钢塔(钢管塔)施工,C1,C2",
|
||
"foreman": "古乾明",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "115.22436",
|
||
"lat": "33.055845",
|
||
"workManage": "古乾明",
|
||
"workManagePhone": "15229746666",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12H0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "孔店~龙门500千伏线路增容改造工程",
|
||
"workContent": "流动式起重机立塔(塔高60米以上),角钢塔(钢管塔)施工,G78",
|
||
"foreman": "范正平",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "117.098890",
|
||
"lat": "32.315388",
|
||
"workManage": "范正平",
|
||
"workManagePhone": "18757292610",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12Z0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "亳二~平圩(孔店)线路开断接入潘集变500千伏线路工程",
|
||
"workContent": "机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,A1-13,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,A1-9,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,A2-13",
|
||
"foreman": "罗鑫班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "116.749652",
|
||
"lat": "32.796867",
|
||
"workManage": "罗鑫",
|
||
"workManagePhone": "15209851900",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12Z0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "3",
|
||
"proName": "沙河500kV变电站220kV太和间隔扩建工程",
|
||
"workContent": "土建间隔扩建施工,改扩建施工,扩建间隔,材料、设备搬运、绿化、地面卫生清扫,改扩建施工,间隔扩建,混凝土、砂浆搅拌及浇筑,混凝土工程,太和扩建间隔,开挖深度在3m以内的基坑挖土(不含3m),土方开挖,太和扩建间隔,接地网施工,接地网施工,间隔扩建",
|
||
"foreman": "许广路班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "115.566017",
|
||
"lat": "33.06304",
|
||
"workManage": "许广路",
|
||
"workManagePhone": "15077966570",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12H0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "王窑-青疃T接至马店35kV架空线路工程标段01",
|
||
"workContent": "流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,A1,流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,A10,流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,A13,流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,A2,流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,A3,流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,A4,流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,A6,流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,A7,流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,A8",
|
||
"foreman": "王兵团班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "116.36818",
|
||
"lat": "33.654426",
|
||
"workManage": "王兵团",
|
||
"workManagePhone": "13965770940",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12T0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "孔店~龙门500千伏线路增容改造工程",
|
||
"workContent": "流动式起重机立塔(塔高60米以上),角钢塔(钢管塔)施工,G86,流动式起重机立塔(塔高60米以上),角钢塔(钢管塔)施工,G87,流动式起重机立塔(塔高60米以上),角钢塔(钢管塔)施工,G88,流动式起重机立塔(塔高60米以上),角钢塔(钢管塔)施工,G89,流动式起重机立塔(塔高60米以上),角钢塔(钢管塔)施工,G90",
|
||
"foreman": "曾明进班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "117.102604",
|
||
"lat": "32.267258",
|
||
"workManage": "曾明进",
|
||
"workManagePhone": "15156574699",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12Z0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "马鞍山叶家桥110千伏变电站新建工程",
|
||
"workContent": "钢结构地面加工、组装,钢结构安装,马鞍山叶家桥110千伏变电站新建工程,檩条及墙板安装,钢结构安装,马鞍山叶家桥110千伏变电站新建工程,装配式围墙施工,装配式围墙施工,马鞍山叶家桥110千伏变电站新建工程,彩板压制、安装,钢结构彩板安装,马鞍山叶家桥110千伏变电站新建工程",
|
||
"foreman": "朱润生班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "118.776191",
|
||
"lat": "31.57671",
|
||
"workManage": "朱润生",
|
||
"workManagePhone": "13905645908",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12B0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "合肥龙泉220kV变电站新建工程标段01",
|
||
"workContent": "混凝土作业,混凝土工程,合肥龙泉220kV变电站新建工程,防水、保温层施工,防水、保温层施工,合肥龙泉220kV变电站新建工程,主体填充墙砌筑,砌筑工程,合肥龙泉220kV变电站新建工程,钢筋安装,钢筋工程,合肥龙泉220kV变电站新建工程,场地平整,站区四通一平、站区道路工程,合肥龙泉220kV变电站新建工程,接地网施工,接地网施工,合肥龙泉220kV变电站新建工程,消防管道管网施工,消防管道管网施工,合肥龙泉220kV变电站新建工程,水电作业,水电工程,合肥龙泉220kV变电站新建工程,模板安拆,模板工程,合肥龙泉220kV变电站新建工程,抹灰施工,抹灰工程,合肥龙泉220kV变电站新建工程,开挖深度在3m以内的基坑挖土(不含3m),土方开挖,合肥龙泉220kV变电站新建工程",
|
||
"foreman": "王玉春班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "117.514139",
|
||
"lat": "31.858611",
|
||
"workManage": "王玉春",
|
||
"workManagePhone": "18326600291",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12A0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "凌云220kV变电站新建工程标段01",
|
||
"workContent": "混凝土作业,混凝土工程,全站,钢筋安装,钢筋工程,全站,模板安拆,模板工程,全站,高度不超过5m且跨度不超过10m混凝土模板支撑系统,模板工程,全站,接地网施工,接地网施工,全站,水电作业,水电工程,全站,开挖深度在3m以内的基坑挖土(不含3m),土方开挖,全站",
|
||
"foreman": "变电土建班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "116.735315",
|
||
"lat": "33.929444",
|
||
"workManage": "鲁学宽",
|
||
"workManagePhone": "13966281301",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12P0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "横山-贺庄220kV线路工程",
|
||
"workContent": "一般土石方及掏挖基础机械开挖,一般土石方开挖,GB95,一般土石方及掏挖基础机械开挖,一般土石方开挖,GC9,钢筋绑扎安装作业,钢筋工程,GB95,钢筋绑扎安装作业,钢筋工程,GC9,混凝土浇筑作业,混凝土浇筑,GB95,混凝土浇筑作业,混凝土浇筑,GC9,开掘敷设和焊接回填,接地工程,GB113,开掘敷设和焊接回填,接地工程,GB95,开掘敷设和焊接回填,接地工程,GC8,开掘敷设和焊接回填,接地工程,GC9",
|
||
"foreman": "王建班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "118.034321",
|
||
"lat": "32.789906",
|
||
"workManage": "王建",
|
||
"workManagePhone": "15155462083",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12M0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "阜四500kV变电站新建工程",
|
||
"workContent": "开挖深度在3m以内的基坑挖土(不含3m),土方开挖,220kVGIS基础,开挖深度在3m以内的基坑挖土(不含3m),土方开挖,220千伏支架基础,开挖深度在3m以内的基坑挖土(不含3m),土方开挖,35千伏支架基础,开挖深度在3m以内的基坑挖土(不含3m),土方开挖,500kVGIS,开挖深度在3m以内的基坑挖土(不含3m),土方开挖,主变、220kV、35kV继电器室及站用电室,开挖深度在3m以内的基坑挖土(不含3m),土方开挖,主变基础、主变构架基础及防火墙基础,开挖深度在3m以内的基坑挖土(不含3m),土方开挖,安徽阜阳阜四变电站工程,开挖深度在3m以内的基坑挖土(不含3m),土方开挖,独立避雷针基础,水电作业,水电工程,安徽阜阳阜四500千伏变电站工程,道路施工,站区四通一平、站区道路工程,安徽阜阳阜四变电站工程,电缆沟砌筑,砖砌电缆沟,500kV继电器室,电缆沟砌筑,砖砌电缆沟,主控通信室,电缆沟砌筑,砖砌电缆沟,安徽阜阳阜四500千伏变电站工程,模板安拆,模板工程,220kVGIS基础,模板安拆,模板工程,220千伏支架基础,模板安拆,模板工程,35千伏支架基础,模板安拆,模板工程,500kVGIS,模板安拆,模板工程,主变、220kV、35kV继电器室及站用电室,模板安拆,模板工程,主变基础、主变构架基础及防火墙基础,模板安拆,模板工程,独立避雷针基础,接地网施工,接地网施工,安徽阜阳阜四500千伏变电站工程,钢筋安装,钢筋工程,220kVGIS基础,钢筋安装,钢筋工程,220千伏支架基础,钢筋安装,钢筋工程,35千伏支架基础,钢筋安装,钢筋工程,500kVGIS,钢筋安装,钢筋工程,主变、220kV、35kV继电器室及站用电室,钢筋安装,钢筋工程,主变基础、主变构架基础及防火墙基础,钢筋安装,钢筋工程,独立避雷针基础,混凝土作业,混凝土工程,220kVGIS基础,混凝土作业,混凝土工程,220千伏支架基础,混凝土作业,混凝土工程,35千伏支架基础,混凝土作业,混凝土工程,500kVGIS,混凝土作业,混凝土工程,主变、220kV、35kV继电器室及站用电室,混凝土作业,混凝土工程,主变基础、主变构架基础及防火墙基础,混凝土作业,混凝土工程,安徽阜阳阜四变电站工程,混凝土作业,混凝土工程,独立避雷针基础",
|
||
"foreman": "土建班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "115.391371",
|
||
"lat": "32.948879",
|
||
"workManage": "王子祥",
|
||
"workManagePhone": "18655233955",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12Z0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "至德(东至)-政源220kV线路工程",
|
||
"workContent": "流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,G66(B线),流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,G68(B线),流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,G69(B线)",
|
||
"foreman": "何正文班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "116.90267",
|
||
"lat": "30.093258",
|
||
"workManage": "何正文",
|
||
"workManagePhone": "15708788128",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12R0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "3",
|
||
"proName": "白莲崖-龙井 110kV 线路工程",
|
||
"workContent": "内悬浮内拉线抱杆分解组塔(应用国网芯降风险设备),角钢塔(钢管塔)施工,11#,12#,13#,杆塔螺栓复紧与消缺,角钢塔(钢管塔)施工,11#,12#,13#",
|
||
"foreman": "唐龙遂班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "0",
|
||
"ballNo": null,
|
||
"lon": "116.331429",
|
||
"lat": "31.435721",
|
||
"workManage": "唐龙遂",
|
||
"workManagePhone": "18982676023",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12N0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "马鞍山叶家桥110千伏变电站新建工程",
|
||
"workContent": "场地平整,站区四通一平、站区道路工程,马鞍山叶家桥110千伏变电站新建工程,电缆沟砌筑,砖砌电缆沟,马鞍山叶家桥110千伏变电站新建工程,抹灰施工,抹灰工程,马鞍山叶家桥110千伏变电站新建工程,装饰装修作业,装饰装修工程,马鞍山叶家桥110千伏变电站新建工程,水电作业,水电工程,马鞍山叶家桥110千伏变电站新建工程,混凝土作业,混凝土工程,马鞍山叶家桥110千伏变电站新建工程,钢筋安装,钢筋工程,马鞍山叶家桥110千伏变电站新建工程,接地网施工,接地网施工,马鞍山叶家桥110千伏变电站新建工程,防水、保温层施工,防水、保温层施工,马鞍山叶家桥110千伏变电站新建工程,模板安拆,模板工程,马鞍山叶家桥110千伏变电站新建工程",
|
||
"foreman": "土建朱家权班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "118.776188",
|
||
"lat": "31.57672",
|
||
"workManage": "朱家权",
|
||
"workManagePhone": "15255629527",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12B0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "3",
|
||
"proName": "桥头集~刘桥T接富山线π入陂塘110kV线路工程标段01",
|
||
"workContent": "内悬浮外拉线抱杆分解组塔,角钢塔(钢管塔)施工,BG24、BG25、BG26、BG27、BG28、BG30、BG31、BG32、BG33悬浮抱杆立塔外拉线杆塔组立、杆塔消缺",
|
||
"foreman": "桥头集~刘桥T接富山线π入陂塘110KV线路工程程启祥班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "117.563105",
|
||
"lat": "31.902425",
|
||
"workManage": "程启祥",
|
||
"workManagePhone": "17730278956",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12A0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "3",
|
||
"proName": "龙门-卫田220kV线路工程标段01",
|
||
"workContent": "内悬浮外拉线抱杆分解组塔,角钢塔(钢管塔)施工,B11#、B22#、B23#、B24#、B27#抱杆立塔,B33#、B32#、B27#运输塔材,分料,组装",
|
||
"foreman": "杨海平班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "117.205791",
|
||
"lat": "32.064416",
|
||
"workManage": "杨海平",
|
||
"workManagePhone": "13980331098",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12A0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "3",
|
||
"proName": "耿皇-四清35kV架空线路工程标段01",
|
||
"workContent": "导地线展放,导地线展放,#39,#40,#41,#42,#43,#44,#45,#46,#47,#48,#49,#50,#51,#52,#53,#54,#55,#56,紧线、挂线作业,紧线、挂线作业,#39,#40,#41,#42,#43,#44,#45,#46,#47,#48,#49,#50,#51,#52,#53,#54,#55,#56,人力展放导引绳,导引绳展放,#39,#40,#41,#42,#43,#44,#45,#46,#47,#48,#49,#50,#51,#52,#53,#54,#55,#56,附件安装,杆塔附件安装,#39,#40,#41,#42,#43,#44,#45,#46,#47,#48,#49,#50,#51,#52,#53,#54,#55,#56,挂绝缘子及放线滑车,绝缘子挂设,#39,#40,#41,#42,#43,#44,#45,#46,#47,#48,#49,#50,#51,#52,#53,#54,#55,#56",
|
||
"foreman": "孟小超班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "116.088114",
|
||
"lat": "33.671796",
|
||
"workManage": "孟小超",
|
||
"workManagePhone": "18356731689",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12T0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "蓉城-天屏(T接永胜)π入木镇变电站110kV线路工程",
|
||
"workContent": "杆塔、架线验收消缺,中间验收,A15-A19、B15-B19,杆塔、架线验收消缺,中间验收,A30-A37,杆塔、架线验收消缺,中间验收,新建#6,杆塔、架线验收消缺,中间验收,新建#7,杆塔、架线验收消缺,中间验收,新建#8",
|
||
"foreman": "黄伟班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "117.93515",
|
||
"lat": "30.730778",
|
||
"workManage": "黄伟",
|
||
"workManagePhone": "13685655881",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12R0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "太和~旧县π入李腰变电站110kV线路工程",
|
||
"workContent": "开掘敷设和焊接回填,接地工程,E1,开掘敷设和焊接回填,接地工程,E2,开掘敷设和焊接回填,接地工程,E3,混凝土浇筑作业,混凝土浇筑,E1,混凝土浇筑作业,混凝土浇筑,E2,混凝土浇筑作业,混凝土浇筑,E3,钢筋绑扎安装作业,钢筋工程,E1,钢筋绑扎安装作业,钢筋工程,E2,钢筋绑扎安装作业,钢筋工程,E3,一般土石方及掏挖基础机械开挖,一般土石方开挖,E1,一般土石方及掏挖基础机械开挖,一般土石方开挖,E2,一般土石方及掏挖基础机械开挖,一般土石方开挖,E3",
|
||
"foreman": "陈爱兵班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "115.558059",
|
||
"lat": "33.174856",
|
||
"workManage": "陈爱兵",
|
||
"workManagePhone": "18726302668",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12H0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "余桥-银山220kV线路工程",
|
||
"workContent": "设计坑深小于5m一般土石方人工开挖,一般土石方开挖,T10,设计坑深小于5m一般土石方人工开挖,一般土石方开挖,T15,设计坑深小于5m一般土石方人工开挖,一般土石方开挖,T7,设计坑深小于5m一般土石方人工开挖,一般土石方开挖,T8,设计坑深小于5m一般土石方人工开挖,一般土石方开挖,T9,钢筋绑扎安装作业,钢筋工程,T10,钢筋绑扎安装作业,钢筋工程,T15,钢筋绑扎安装作业,钢筋工程,T7,钢筋绑扎安装作业,钢筋工程,T8,钢筋绑扎安装作业,钢筋工程,T9,混凝土浇筑作业,混凝土浇筑,T10,混凝土浇筑作业,混凝土浇筑,T15,混凝土浇筑作业,混凝土浇筑,T7,混凝土浇筑作业,混凝土浇筑,T8,混凝土浇筑作业,混凝土浇筑,T9",
|
||
"foreman": "陈云班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "0",
|
||
"ballNo": null,
|
||
"lon": "116.409355",
|
||
"lat": "30.538702",
|
||
"workManage": "陈云",
|
||
"workManagePhone": "13955819830",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12D0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "3",
|
||
"proName": "汪墩—挥手π入高皇变220kV线路工程",
|
||
"workContent": "导地线展放,导地线展放,构架-A1#-A5# 构架-B1#-B5#,人力展放导引绳,导引绳展放,构架-A1#-A5# 构架-B1#-B5#,挂绝缘子及放线滑车,绝缘子挂设,构架-A1#-A5# 构架-B1#-B5#,附件安装,杆塔附件安装,构架-A1#-A5# 构架-B1#-B5#,紧线、挂线作业,紧线、挂线作业,构架-A1#-A5# 构架-B1#-B5#",
|
||
"foreman": "张伟",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "116.399544",
|
||
"lat": "31.817922",
|
||
"workManage": "张伟",
|
||
"workManagePhone": "18855137980",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12N0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "太和-徐寨π入李腰变电站220kV线路工程",
|
||
"workContent": "一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,B1,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,B10,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,B11,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,B12,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,B13,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,B14,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,B15,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,B16,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,B17,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,B18,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,B19,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,B2,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,B20,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,B3,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,B4,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,B5,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,B6,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,B7,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,B8,一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,B9",
|
||
"foreman": "杨贵川班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "115.516065",
|
||
"lat": "33.162764",
|
||
"workManage": "杨贵川",
|
||
"workManagePhone": "18682857666",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12H0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "2",
|
||
"proName": "宁四-桃花园牵引站220kV线路工程",
|
||
"workContent": "导地线展放(内含二级风险跨越),导地线展放,24,25,26,27 ,28,29,30,31,32,人力展放导引绳,导引绳展放,24,25,26,27 ,28,29,30,31,32,附件安装(内含二级风险跨越),杆塔附件安装,25,26,27 ,28,29,30,紧线、挂线作业(内含二级风险跨越),紧线、挂线作业,27,29,31",
|
||
"foreman": "贺开军班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "118.946293",
|
||
"lat": "30.527836",
|
||
"workManage": "贺开军",
|
||
"workManagePhone": "15215126128",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12G0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "西溪南110kV变电站新建工程",
|
||
"workContent": "檩条及墙板安装,钢结构安装,西溪南110kV变电站新建工程",
|
||
"foreman": "装饰装修班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "118.294551",
|
||
"lat": "29.847477",
|
||
"workManage": "谢国文",
|
||
"workManagePhone": "18555800950",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12S0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "汪墩—挥手π入高皇变220kV线路工程",
|
||
"workContent": "杆塔螺栓复紧与消缺,角钢塔(钢管塔)施工,A1#-A5#,流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,A1#-A5#",
|
||
"foreman": "毛栋班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "116.406671",
|
||
"lat": "31.817226",
|
||
"workManage": "毛栋",
|
||
"workManagePhone": "13635603542",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12N0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "孔店~龙门500千伏线路增容改造工程",
|
||
"workContent": "流动式起重机立塔(塔高60米以上),角钢塔(钢管塔)施工,G100,流动式起重机立塔(塔高60米以上),角钢塔(钢管塔)施工,G97",
|
||
"foreman": "刘丛新班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "117.09501",
|
||
"lat": "32.223145",
|
||
"workManage": "刘丛新",
|
||
"workManagePhone": "19805650767",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12Z0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "派河220kV变电站新建工程标段01",
|
||
"workContent": "场地平整,站区四通一平、站区道路工程,派河220kV变电站新建工程,防水、保温层施工,防水、保温层施工,派河220kV变电站新建工程",
|
||
"foreman": "占克中土建班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "117.178019",
|
||
"lat": "31.651815",
|
||
"workManage": "占克中",
|
||
"workManagePhone": "18325658823",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12A0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "六安山杜220kV变电站新建工程",
|
||
"workContent": "水电作业,水电工程,六安山杜220kV变电站新建工程,防水、保温层施工,防水、保温层施工,六安山杜220kV变电站新建工程,现浇式电缆沟施工,现浇式电缆沟施工,六安山杜220kV变电站新建工程,混凝土、砂浆搅拌及浇筑,混凝土工程,六安山杜220kV变电站新建工程,开挖深度在3m以内的基坑挖土(不含3m),土方开挖,六安山杜220kV变电站新建工程,钢筋安装,钢筋工程,六安山杜220kV变电站新建工程,场地平整,站区四通一平、站区道路工程,六安山杜220kV变电站新建工程,模板安拆,模板工程,六安山杜220kV变电站新建工程,消防管道管网施工,消防管道管网施工,六安山杜220kV变电站新建工程,接地网施工,接地网施工,六安山杜220kV变电站新建工程,电缆沟砌筑,砖砌电缆沟,六安山杜220kV变电站新建工程",
|
||
"foreman": "常德地",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "116.652802",
|
||
"lat": "31.791805",
|
||
"workManage": "常德地",
|
||
"workManagePhone": "18215662631",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12N0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "通江-江北220kV线路工程",
|
||
"workContent": "钢筋绑扎安装作业,钢筋工程,T27,钢筋绑扎安装作业,钢筋工程,T44,混凝土浇筑作业,混凝土浇筑,T27,混凝土浇筑作业,混凝土浇筑,T44,开掘敷设和焊接回填,接地工程,T27,开掘敷设和焊接回填,接地工程,T44,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,T27,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,T44",
|
||
"foreman": "陶青山班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "118.165482",
|
||
"lat": "31.368374",
|
||
"workManage": "陶青山",
|
||
"workManagePhone": "17206081378",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12C0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "金牛-榆墩、金牛-移湖T接汤池变110kV架空线路工程标段01",
|
||
"workContent": "模板安拆,模板工程,G29,模板安拆,模板工程,G3,模板安拆,模板工程,G30,模板安拆,模板工程,G31,模板安拆,模板工程,G32,模板安拆,模板工程,G4,模板安拆,模板工程,G5,模板安拆,模板工程,G7,模板安拆,模板工程,G8,模板安拆,模板工程,G9,一般土石方及掏挖基础机械开挖,一般土石方开挖,G29,一般土石方及掏挖基础机械开挖,一般土石方开挖,G3,一般土石方及掏挖基础机械开挖,一般土石方开挖,G30,一般土石方及掏挖基础机械开挖,一般土石方开挖,G31,一般土石方及掏挖基础机械开挖,一般土石方开挖,G32,一般土石方及掏挖基础机械开挖,一般土石方开挖,G4,一般土石方及掏挖基础机械开挖,一般土石方开挖,G5,一般土石方及掏挖基础机械开挖,一般土石方开挖,G7,一般土石方及掏挖基础机械开挖,一般土石方开挖,G8,一般土石方及掏挖基础机械开挖,一般土石方开挖,G9,混凝土浇筑作业,混凝土浇筑,G29,混凝土浇筑作业,混凝土浇筑,G3,混凝土浇筑作业,混凝土浇筑,G30,混凝土浇筑作业,混凝土浇筑,G31,混凝土浇筑作业,混凝土浇筑,G32,混凝土浇筑作业,混凝土浇筑,G4,混凝土浇筑作业,混凝土浇筑,G5,混凝土浇筑作业,混凝土浇筑,G7,混凝土浇筑作业,混凝土浇筑,G8,混凝土浇筑作业,混凝土浇筑,G9,钢筋绑扎安装作业,钢筋工程,G29,钢筋绑扎安装作业,钢筋工程,G3,钢筋绑扎安装作业,钢筋工程,G30,钢筋绑扎安装作业,钢筋工程,G31,钢筋绑扎安装作业,钢筋工程,G32,钢筋绑扎安装作业,钢筋工程,G4,钢筋绑扎安装作业,钢筋工程,G5,钢筋绑扎安装作业,钢筋工程,G7,钢筋绑扎安装作业,钢筋工程,G8,钢筋绑扎安装作业,钢筋工程,G9",
|
||
"foreman": "许善仙班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "117.228107",
|
||
"lat": "31.35441",
|
||
"workManage": "许善仙",
|
||
"workManagePhone": "15055707816",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12A0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "柏村~头铺220kV线路工程标段01",
|
||
"workContent": "流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,C18,流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,C20# C21#,流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,C27,流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,C28",
|
||
"foreman": "陈中林",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "117.766616",
|
||
"lat": "33.108402",
|
||
"workManage": "陈中林",
|
||
"workManagePhone": "18782611028",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12L0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "3",
|
||
"proName": "板集电厂二期-原鹿500kV线路工程标段",
|
||
"workContent": "附件安装,杆塔附件安装,N10,N11,N12,N13,N2,N3,N4,N5,N6,N7,N8,N9,紧线、挂线作业,紧线、挂线作业,N13,N8",
|
||
"foreman": "18班",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "116.234255",
|
||
"lat": "32.86508",
|
||
"workManage": "洪德宝",
|
||
"workManagePhone": "13966601020",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12Z0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "龙井~山七改接东石笋变电站110kV线路工程",
|
||
"workContent": "人力展放导引绳,导引绳展放,A1#,人力展放导引绳,导引绳展放,A10#,人力展放导引绳,导引绳展放,A11#,人力展放导引绳,导引绳展放,A12#,人力展放导引绳,导引绳展放,A13#,人力展放导引绳,导引绳展放,A14#,人力展放导引绳,导引绳展放,A15#,人力展放导引绳,导引绳展放,A16#,人力展放导引绳,导引绳展放,A17#,人力展放导引绳,导引绳展放,A18#,人力展放导引绳,导引绳展放,A19#,人力展放导引绳,导引绳展放,A2#,人力展放导引绳,导引绳展放,A20#,人力展放导引绳,导引绳展放,A21#,人力展放导引绳,导引绳展放,A22#,人力展放导引绳,导引绳展放,A23#,人力展放导引绳,导引绳展放,A24#,人力展放导引绳,导引绳展放,A25#,人力展放导引绳,导引绳展放,A26#,人力展放导引绳,导引绳展放,A27#,人力展放导引绳,导引绳展放,A28#,人力展放导引绳,导引绳展放,A29#,人力展放导引绳,导引绳展放,A3#,人力展放导引绳,导引绳展放,A30#,人力展放导引绳,导引绳展放,A31#,人力展放导引绳,导引绳展放,A32#,人力展放导引绳,导引绳展放,A33#,人力展放导引绳,导引绳展放,A4#,人力展放导引绳,导引绳展放,A5#,人力展放导引绳,导引绳展放,A6#,人力展放导引绳,导引绳展放,A7#,人力展放导引绳,导引绳展放,A8#,人力展放导引绳,导引绳展放,A9#,杆塔螺栓复紧与消缺,角钢塔(钢管塔)施工,A1#-A33#,挂绝缘子及放线滑车,绝缘子挂设,A1#,挂绝缘子及放线滑车,绝缘子挂设,A10#,挂绝缘子及放线滑车,绝缘子挂设,A11#,挂绝缘子及放线滑车,绝缘子挂设,A12#,挂绝缘子及放线滑车,绝缘子挂设,A13#,挂绝缘子及放线滑车,绝缘子挂设,A14#,挂绝缘子及放线滑车,绝缘子挂设,A15#,挂绝缘子及放线滑车,绝缘子挂设,A16#,挂绝缘子及放线滑车,绝缘子挂设,A17#,挂绝缘子及放线滑车,绝缘子挂设,A18#,挂绝缘子及放线滑车,绝缘子挂设,A19#,挂绝缘子及放线滑车,绝缘子挂设,A2#,挂绝缘子及放线滑车,绝缘子挂设,A20#,挂绝缘子及放线滑车,绝缘子挂设,A21#,挂绝缘子及放线滑车,绝缘子挂设,A22#,挂绝缘子及放线滑车,绝缘子挂设,A23#,挂绝缘子及放线滑车,绝缘子挂设,A24#,挂绝缘子及放线滑车,绝缘子挂设,A25#,挂绝缘子及放线滑车,绝缘子挂设,A26#,挂绝缘子及放线滑车,绝缘子挂设,A27#,挂绝缘子及放线滑车,绝缘子挂设,A28#,挂绝缘子及放线滑车,绝缘子挂设,A29#,挂绝缘子及放线滑车,绝缘子挂设,A3#,挂绝缘子及放线滑车,绝缘子挂设,A30#,挂绝缘子及放线滑车,绝缘子挂设,A31#,挂绝缘子及放线滑车,绝缘子挂设,A32#,挂绝缘子及放线滑车,绝缘子挂设,A33#,挂绝缘子及放线滑车,绝缘子挂设,A4#,挂绝缘子及放线滑车,绝缘子挂设,A5#,挂绝缘子及放线滑车,绝缘子挂设,A6#,挂绝缘子及放线滑车,绝缘子挂设,A7#,挂绝缘子及放线滑车,绝缘子挂设,A8#,挂绝缘子及放线滑车,绝缘子挂设,A9#",
|
||
"foreman": "武必科班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "116.45908",
|
||
"lat": "31.339462",
|
||
"workManage": "武必科",
|
||
"workManagePhone": "15758931383",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12N0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "芜湖双桥110kV变电站新建工程",
|
||
"workContent": "二次设备调试,电气调试试验,主 控楼,变电站验收、消缺作业,投产送电,芜湖双桥110kV变电站新建工程",
|
||
"foreman": "电气施工班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "118.608806",
|
||
"lat": "31.165117",
|
||
"workManage": "宦述云",
|
||
"workManagePhone": "13855309327",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12C0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "孔店~龙门500千伏线路增容改造工程",
|
||
"workContent": "一般跨越架搭设和拆除(全高18m以下),跨越公路、铁路、航道作业,G65-G103",
|
||
"foreman": "跨越架",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "117.120896",
|
||
"lat": "32.315158",
|
||
"workManage": "何光述",
|
||
"workManagePhone": "513021196609124778",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12Z0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "李楼110kV变电站新建工程标段01",
|
||
"workContent": "110kV及以上高压电缆敷设,电缆敷设及二次接线,全站,电缆支架、电缆预埋管、电缆槽盒安装,电缆敷设及二次接线,全站,电缆搬运、敷设二次接线,电缆敷设及二次接线,全站,屏、柜、箱搬运、开箱及就位,开关柜、屏安装,全站,户内GIS就位.安装及充气,GIS组合电器安装,全站,变压器.电抗器安装(油浸/不吊罩),油浸电力变压器.油浸电抗器施工作业,全站,母线桥及其附件安装,母线桥施工作业,全站",
|
||
"foreman": "杨梦华班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "116.81537",
|
||
"lat": "33.936584",
|
||
"workManage": "杨梦华",
|
||
"workManagePhone": "15939462418",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12P0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "板集电厂二期-原鹿500kV线路工程标段",
|
||
"workContent": "杆塔螺栓复紧与消缺,角钢塔(钢管塔)施工,N112,杆塔螺栓复紧与消缺,角钢塔(钢管塔)施工,N114,杆塔螺栓复紧与消缺,角钢塔(钢管塔)施工,N116,杆塔螺栓复紧与消缺,角钢塔(钢管塔)施工,N117,杆塔螺栓复紧与消缺,角钢塔(钢管塔)施工,N118,杆塔螺栓复紧与消缺,角钢塔(钢管塔)施工,N123,杆塔螺栓复紧与消缺,角钢塔(钢管塔)施工,N127,杆塔螺栓复紧与消缺,角钢塔(钢管塔)施工,N128,杆塔螺栓复紧与消缺,角钢塔(钢管塔)施工,N129,杆塔螺栓复紧与消缺,角钢塔(钢管塔)施工,N130,杆塔螺栓复紧与消缺,角钢塔(钢管塔)施工,N131,杆塔螺栓复紧与消缺,角钢塔(钢管塔)施工,N132,杆塔螺栓复紧与消缺,角钢塔(钢管塔)施工,N133,杆塔螺栓复紧与消缺,角钢塔(钢管塔)施工,N134,杆塔螺栓复紧与消缺,角钢塔(钢管塔)施工,N135,杆塔螺栓复紧与消缺,角钢塔(钢管塔)施工,N136,杆塔螺栓复紧与消缺,角钢塔(钢管塔)施工,N136,杆塔螺栓复紧与消缺,角钢塔(钢管塔)施工,N141,杆塔螺栓复紧与消缺,角钢塔(钢管塔)施工,N142,杆塔螺栓复紧与消缺,角钢塔(钢管塔)施工,N143,杆塔螺栓复紧与消缺,角钢塔(钢管塔)施工,N145,杆塔螺栓复紧与消缺,角钢塔(钢管塔)施工,N146,杆塔螺栓复紧与消缺,角钢塔(钢管塔)施工,N147,杆塔螺栓复紧与消缺,角钢塔(钢管塔)施工,N155,杆塔螺栓复紧与消缺,角钢塔(钢管塔)施工,N156,杆塔螺栓复紧与消缺,角钢塔(钢管塔)施工,N159,杆塔螺栓复紧与消缺,角钢塔(钢管塔)施工,N161,杆塔螺栓复紧与消缺,角钢塔(钢管塔)施工,N169,杆塔螺栓复紧与消缺,角钢塔(钢管塔)施工,N173,杆塔螺栓复紧与消缺,角钢塔(钢管塔)施工,N94",
|
||
"foreman": "张勇组塔班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "115.926741",
|
||
"lat": "32.682308",
|
||
"workManage": "张勇",
|
||
"workManagePhone": "18111393539",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12Z0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "柏村~头铺220kV线路工程标段01",
|
||
"workContent": "流动式起重机立塔(塔高60米及以下),角钢塔(钢管塔)施工,C1-C3",
|
||
"foreman": "刘彦雷班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "0",
|
||
"ballNo": null,
|
||
"lon": "117.828794",
|
||
"lat": "33.124897",
|
||
"workManage": "刘彦雷",
|
||
"workManagePhone": "15212178736",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12L0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "3",
|
||
"proName": "白莲崖-龙井 110kV 线路工程",
|
||
"workContent": "金属索道架设及运输,工地运输,G1#-G40#",
|
||
"foreman": "李国富班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "116.31686",
|
||
"lat": "31.255107",
|
||
"workManage": "李国富",
|
||
"workManagePhone": "15987855668",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12N0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "亳州真源220kV变电站新建工程标段01",
|
||
"workContent": "接地网施工,接地网施工,亳州真源220kV变电站新建工程,装饰装修作业,装饰装修工程,亳州真源220kV变电站新建工程,水电作业,水电工程,亳州真源220kV变电站新建工程,高度不超过5m且跨度不超过10m混凝土模板支撑系统,模板工程,亳州真源220kV变电站新建工程,抹灰施工,抹灰工程,亳州真源220kV变电站新建工程,主体填充墙砌筑,砌筑工程,亳州真源220kV变电站新建工程,电缆沟砌筑,砖砌电缆沟,亳州真源220kV变电站新建工程,开挖深度在3m以内的基坑挖土(不含3m),土方开挖,亳州真源220kV变电站新建工程,场地平整,站区四通一平、站区道路工程,亳州真源220kV变电站新建工程,消防管道管网施工,消防管道管网施工,亳州真源220kV变电站新建工程,防水、保温层施工,防水、保温层施工,亳州真源220kV变电站新建工程,混凝土作业,混凝土工程,亳州真源220kV变电站新建工程,钢筋安装,钢筋工程,亳州真源220kV变电站新建工程",
|
||
"foreman": "徐蒙蒙班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "116.200016",
|
||
"lat": "33.454867",
|
||
"workManage": "徐蒙蒙",
|
||
"workManagePhone": "19166131783",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12T0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "韦寨-潘寨、韦寨-张营T接迎仙变电站110kV线路工程",
|
||
"workContent": "人力展放导引绳,导引绳展放,G1#,人力展放导引绳,导引绳展放,G10#,人力展放导引绳,导引绳展放,G11#,人力展放导引绳,导引绳展放,G12#,人力展放导引绳,导引绳展放,G13#,人力展放导引绳,导引绳展放,G14#,人力展放导引绳,导引绳展放,G15#,人力展放导引绳,导引绳展放,G16#,人力展放导引绳,导引绳展放,G17#,人力展放导引绳,导引绳展放,G18#,人力展放导引绳,导引绳展放,G19#,人力展放导引绳,导引绳展放,G2#,人力展放导引绳,导引绳展放,G20#,人力展放导引绳,导引绳展放,G21#,人力展放导引绳,导引绳展放,G22#,人力展放导引绳,导引绳展放,G23#,人力展放导引绳,导引绳展放,G24#,人力展放导引绳,导引绳展放,G25#,人力展放导引绳,导引绳展放,G26#,人力展放导引绳,导引绳展放,G27#,人力展放导引绳,导引绳展放,G28#,人力展放导引绳,导引绳展放,G29#,人力展放导引绳,导引绳展放,G3#,人力展放导引绳,导引绳展放,G30#,人力展放导引绳,导引绳展放,G31#,人力展放导引绳,导引绳展放,G32#,人力展放导引绳,导引绳展放,G33#,人力展放导引绳,导引绳展放,G34#,人力展放导引绳,导引绳展放,G35#,人力展放导引绳,导引绳展放,G36#,人力展放导引绳,导引绳展放,G37#,人力展放导引绳,导引绳展放,G38#,人力展放导引绳,导引绳展放,G39#,人力展放导引绳,导引绳展放,G4#,人力展放导引绳,导引绳展放,G40#,人力展放导引绳,导引绳展放,G41#,人力展放导引绳,导引绳展放,G5#,人力展放导引绳,导引绳展放,G6#,人力展放导引绳,导引绳展放,G7#,人力展放导引绳,导引绳展放,G8#,人力展放导引绳,导引绳展放,G9#,挂绝缘子及放线滑车,绝缘子挂设,G1#,挂绝缘子及放线滑车,绝缘子挂设,G10#,挂绝缘子及放线滑车,绝缘子挂设,G11#,挂绝缘子及放线滑车,绝缘子挂设,G12#,挂绝缘子及放线滑车,绝缘子挂设,G13#,挂绝缘子及放线滑车,绝缘子挂设,G14#,挂绝缘子及放线滑车,绝缘子挂设,G15#,挂绝缘子及放线滑车,绝缘子挂设,G16#,挂绝缘子及放线滑车,绝缘子挂设,G17#,挂绝缘子及放线滑车,绝缘子挂设,G18#,挂绝缘子及放线滑车,绝缘子挂设,G19#,挂绝缘子及放线滑车,绝缘子挂设,G2#,挂绝缘子及放线滑车,绝缘子挂设,G20#,挂绝缘子及放线滑车,绝缘子挂设,G21#,挂绝缘子及放线滑车,绝缘子挂设,G22#,挂绝缘子及放线滑车,绝缘子挂设,G23#,挂绝缘子及放线滑车,绝缘子挂设,G24#,挂绝缘子及放线滑车,绝缘子挂设,G25#,挂绝缘子及放线滑车,绝缘子挂设,G26#,挂绝缘子及放线滑车,绝缘子挂设,G27#,挂绝缘子及放线滑车,绝缘子挂设,G28#,挂绝缘子及放线滑车,绝缘子挂设,G29#,挂绝缘子及放线滑车,绝缘子挂设,G3#,挂绝缘子及放线滑车,绝缘子挂设,G30#,挂绝缘子及放线滑车,绝缘子挂设,G31#,挂绝缘子及放线滑车,绝缘子挂设,G32#,挂绝缘子及放线滑车,绝缘子挂设,G33#,挂绝缘子及放线滑车,绝缘子挂设,G34#,挂绝缘子及放线滑车,绝缘子挂设,G35#,挂绝缘子及放线滑车,绝缘子挂设,G36#,挂绝缘子及放线滑车,绝缘子挂设,G37#,挂绝缘子及放线滑车,绝缘子挂设,G38#,挂绝缘子及放线滑车,绝缘子挂设,G39#,挂绝缘子及放线滑车,绝缘子挂设,G4#,挂绝缘子及放线滑车,绝缘子挂设,G40#,挂绝缘子及放线滑车,绝缘子挂设,G41#,挂绝缘子及放线滑车,绝缘子挂设,G5#,挂绝缘子及放线滑车,绝缘子挂设,G6#,挂绝缘子及放线滑车,绝缘子挂设,G7#,挂绝缘子及放线滑车,绝缘子挂设,G8#,挂绝缘子及放线滑车,绝缘子挂设,G9#",
|
||
"foreman": "立塔架线",
|
||
"foremanPhone": null,
|
||
"ballStatus": "0",
|
||
"ballNo": null,
|
||
"lon": "115.154158",
|
||
"lat": "32.933792",
|
||
"workManage": "姜涛",
|
||
"workManagePhone": "18455836494",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12H0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "莲塘-枣园线泥河变T接线改接甘露变电站110kV架空线路工程",
|
||
"workContent": "混凝土浇筑作业,混凝土浇筑,C10#,混凝土浇筑作业,混凝土浇筑,C2#,混凝土浇筑作业,混凝土浇筑,C41#,钢筋绑扎安装作业,钢筋工程,C10#,钢筋绑扎安装作业,钢筋工程,C2#,钢筋绑扎安装作业,钢筋工程,C41#,一般土石方及掏挖基础机械开挖,一般土石方开挖,C10#,一般土石方及掏挖基础机械开挖,一般土石方开挖,C2#,一般土石方及掏挖基础机械开挖,一般土石方开挖,C41#,开掘敷设和焊接回填,接地工程,C10#,开掘敷设和焊接回填,接地工程,C2#,开掘敷设和焊接回填,接地工程,C41#",
|
||
"foreman": "王铖威",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "118.74851",
|
||
"lat": "30.910017",
|
||
"workManage": "王铖威",
|
||
"workManagePhone": "15655967659",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12G0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "铜陵古塘220kV变电站新建工程标段01",
|
||
"workContent": "装配式围墙施工,装配式围墙施工,古塘变,檩条及墙板安装,钢结构安装,铜陵古塘220kV变电站新建工程",
|
||
"foreman": "陈兵班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "117.273438",
|
||
"lat": "30.737395",
|
||
"workManage": "陈兵",
|
||
"workManagePhone": "15324444621",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12J0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "天湖-白云、天湖-莲塘π入甘露变电站110kV线路工程",
|
||
"workContent": "人力展放导引绳,导引绳展放,A1,人力展放导引绳,导引绳展放,A2,人力展放导引绳,导引绳展放,A3,人力展放导引绳,导引绳展放,A4,人力展放导引绳,导引绳展放,A5,人力展放导引绳,导引绳展放,A6,人力展放导引绳,导引绳展放,A7,人力展放导引绳,导引绳展放,E1,人力展放导引绳,导引绳展放,E2,人力展放导引绳,导引绳展放,E3,人力展放导引绳,导引绳展放,E4,人力展放导引绳,导引绳展放,E5,人力展放导引绳,导引绳展放,E6,人力展放导引绳,导引绳展放,E7,人力展放导引绳,导引绳展放,E8,人力展放导引绳,导引绳展放,E9,人力展放导引绳,导引绳展放,构架,挂绝缘子及放线滑车,绝缘子挂设,A1,挂绝缘子及放线滑车,绝缘子挂设,A2,挂绝缘子及放线滑车,绝缘子挂设,A3,挂绝缘子及放线滑车,绝缘子挂设,A4,挂绝缘子及放线滑车,绝缘子挂设,A5,挂绝缘子及放线滑车,绝缘子挂设,A6,挂绝缘子及放线滑车,绝缘子挂设,A7,挂绝缘子及放线滑车,绝缘子挂设,E1,挂绝缘子及放线滑车,绝缘子挂设,E2,挂绝缘子及放线滑车,绝缘子挂设,E3,挂绝缘子及放线滑车,绝缘子挂设,E4,挂绝缘子及放线滑车,绝缘子挂设,E5,挂绝缘子及放线滑车,绝缘子挂设,E6,挂绝缘子及放线滑车,绝缘子挂设,E7,挂绝缘子及放线滑车,绝缘子挂设,E8,挂绝缘子及放线滑车,绝缘子挂设,E9,挂绝缘子及放线滑车,绝缘子挂设,构架",
|
||
"foreman": "张海涛班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "118.652884",
|
||
"lat": "30.867618",
|
||
"workManage": "张海涛",
|
||
"workManagePhone": "18226208733",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12G0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "黄山徽州~万安双回220kV线路改造工程",
|
||
"workContent": "机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,G10\t,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,G11,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,G9",
|
||
"foreman": "沈强班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "0",
|
||
"ballNo": null,
|
||
"lon": "118.253525",
|
||
"lat": "29.803749",
|
||
"workManage": "沈强",
|
||
"workManagePhone": "13182333258",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12S0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "3",
|
||
"proName": "苏埠-西河口π入青山变电站35kV架空线路工程",
|
||
"workContent": "附着式外拉线抱杆分解组立,角钢塔(钢管塔)施工,#1,#10,#11,#12,#13,#14,#15,#16,#17,#18,#19,#2,#20,#21,#22,#23,#24,#25,#26,#3,#4,#5,#6,#7,#8,#9",
|
||
"foreman": "彭湃班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "0",
|
||
"ballNo": null,
|
||
"lon": "116.39702",
|
||
"lat": "31.557714",
|
||
"workManage": "彭湃",
|
||
"workManagePhone": "13886730595",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12N0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "凤阳-临淮 T 接安东变电站、凤阳-安东110kV 架空线路工程标段01",
|
||
"workContent": "一般土石方及掏挖基础机械开挖,一般土石方开挖,新21,钢筋加工,钢筋工程,新21,开掘敷设和焊接回填,接地工程,新21,混凝土浇筑作业,混凝土浇筑,新21",
|
||
"foreman": "孙永元班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "117.59105",
|
||
"lat": "32.853855",
|
||
"workManage": "孙永元",
|
||
"workManagePhone": "18397128582",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12L0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "3",
|
||
"proName": "白莲崖-龙井 110kV 线路工程",
|
||
"workContent": "内悬浮内拉线抱杆分解组塔(应用国网芯降风险设备),角钢塔(钢管塔)施工,2#,3#,4#,5#,杆塔螺栓复紧与消缺,角钢塔(钢管塔)施工,2#,3#,4#,5#",
|
||
"foreman": "苟兵班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "116.193686",
|
||
"lat": "31.281146",
|
||
"workManage": "苟兵",
|
||
"workManagePhone": "15882590561",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12N0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "合肥淠河110kV变电站新建工程标段01",
|
||
"workContent": "互感器、耦合电容器、避雷器安装,其他户外设备安装,合肥淠河(官亭Ⅱ)110kV变电站,站用变、消弧线圈、二次设备仓安装,其他户外设备安装,合肥淠河(官亭Ⅱ)110kV变电站,其它设备安装(主变中性设备等),其他户外设备安装,合肥淠河(官亭Ⅱ)110kV变电站,屏、柜、箱搬运、开箱及就位,开关柜、屏安装,合肥淠河(官亭Ⅱ)110kV变电站",
|
||
"foreman": "电气班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "116.8849",
|
||
"lat": "31.832894",
|
||
"workManage": "陈军",
|
||
"workManagePhone": "15305647317",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12A0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "3",
|
||
"proName": "板集电厂二期-原鹿500kV线路工程标段",
|
||
"workContent": "导地线展放,导地线展放,N126,N127,N128,N129,N130,N131,挂绝缘子及放线滑车,绝缘子挂设,N143,N144,N145,人力展放导引绳,导引绳展放,N143,N144,挂绝缘子及放线滑车,绝缘子挂设,N142,N146,N147,N148,N149,N150,N151,紧线、挂线作业,紧线、挂线作业,N126,N131,人力展放导引绳,导引绳展放,N145,N146,N147,N148,N149,N150,N142,N151",
|
||
"foreman": "顺全九班",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "116.007502",
|
||
"lat": "32.744394",
|
||
"workManage": "李洋",
|
||
"workManagePhone": "15375549688",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12Z0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "孔店~龙门500千伏线路增容改造工程",
|
||
"workContent": "钢筋绑扎安装作业,钢筋工程,G41,钢筋绑扎安装作业,钢筋工程,G42,钢筋绑扎安装作业,钢筋工程,G60,钢筋绑扎安装作业,钢筋工程,G65,混凝土浇筑作业,混凝土浇筑,G41,混凝土浇筑作业,混凝土浇筑,G42,混凝土浇筑作业,混凝土浇筑,G60,混凝土浇筑作业,混凝土浇筑,G65,一般土石方及掏挖基础机械开挖,一般土石方开挖,G41,一般土石方及掏挖基础机械开挖,一般土石方开挖,G42,一般土石方及掏挖基础机械开挖,一般土石方开挖,G60,一般土石方及掏挖基础机械开挖,一般土石方开挖,G65,开掘敷设和焊接回填,接地工程,G41,开掘敷设和焊接回填,接地工程,G42,开掘敷设和焊接回填,接地工程,G60,开掘敷设和焊接回填,接地工程,G65",
|
||
"foreman": "吕邦班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "117.116193",
|
||
"lat": "32.370378",
|
||
"workManage": "吕邦",
|
||
"workManagePhone": "17681380903",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12Z0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "宋湖~曹村35kV架空线路工程标段01",
|
||
"workContent": "一般土石方及掏挖基础机械开挖,一般土石方开挖,A14,一般土石方及掏挖基础机械开挖,一般土石方开挖,A15,一般土石方及掏挖基础机械开挖,一般土石方开挖,A4,钢筋绑扎安装作业,钢筋工程,A14,钢筋绑扎安装作业,钢筋工程,A15,钢筋绑扎安装作业,钢筋工程,A4,钢筋绑扎安装作业,钢筋工程,A5,钢筋绑扎安装作业,钢筋工程,A6,混凝土浇筑作业,混凝土浇筑,A14,混凝土浇筑作业,混凝土浇筑,A15,混凝土浇筑作业,混凝土浇筑,A4,混凝土浇筑作业,混凝土浇筑,A5,混凝土浇筑作业,混凝土浇筑,A6,开掘敷设和焊接回填,接地工程,A14,开掘敷设和焊接回填,接地工程,A15,开掘敷设和焊接回填,接地工程,A21,开掘敷设和焊接回填,接地工程,A4,开掘敷设和焊接回填,接地工程,A5,开掘敷设和焊接回填,接地工程,A6",
|
||
"foreman": "基础班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "117.142427",
|
||
"lat": "34.043818",
|
||
"workManage": "赵鹤林",
|
||
"workManagePhone": "15956859114",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12Q0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "孔店~龙门500千伏线路增容改造工程",
|
||
"workContent": "流动式起重机立塔(塔高60米以上),角钢塔(钢管塔)施工,G69",
|
||
"foreman": "杨青春",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "117.10736",
|
||
"lat": "32.355648",
|
||
"workManage": "杨青春",
|
||
"workManagePhone": "18980339798",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12Z0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "桓谭-马庄π入、碱河-马庄(T接学院)改接开渠变电站110kV架空线路工程标段01",
|
||
"workContent": "一般土石方及掏挖基础机械开挖,一般土石方开挖,N73,开掘敷设和焊接回填,接地工程,N73,钢筋绑扎安装作业,钢筋工程,N73,混凝土浇筑作业,混凝土浇筑,N73",
|
||
"foreman": "李红磊班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "116.806739",
|
||
"lat": "33.968314",
|
||
"workManage": "李红磊",
|
||
"workManagePhone": "15305617725",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12P0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "宿州濉河220kV变电站新建工程标段01",
|
||
"workContent": "道路施工,站区四通一平、站区道路工程,全站,场地平整,站区四通一平、站区道路工程,全站,屏、柜、箱搬运、开箱及就位,开关柜、屏安装,全站,互感器、耦合电容器、避雷器安装,其他户外设备安装,全站,接地网施工,接地网施工,全站,变压器.电抗器安装(油浸/不吊罩),油浸电力变压器.油浸电抗器施工作业,全站,110kV及以上高压电缆敷设,电缆敷设及二次接线,全站,110kV及以上高压电缆头制作,电缆敷设及二次接线,全站,电缆搬运、敷设二次接线,电缆敷设及二次接线,全站,户外GIS就位、安装及充气,GIS组合电器安装,全站",
|
||
"foreman": "豆帅兵班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "117.839979",
|
||
"lat": "33.481792",
|
||
"workManage": "豆帅兵",
|
||
"workManagePhone": "15225786162",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12Q0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "3",
|
||
"proName": "宿州蟠龙220kV变电站2号主变扩建工程标段01",
|
||
"workContent": "变压器.电抗器安装(油浸/不吊罩),油浸电力变压器.油浸电抗器施工作业,蟠龙扩2#变,一次设备耐压试验,电气调试试验,蟠龙扩2#变,道路施工,站区四通一平、站区道路工程,蟠龙扩2#变,屏、柜、箱搬运、开箱及就位,开关柜、屏安装,蟠龙扩2#变,改扩建工程二次设备试验,电气调试试验,蟠龙扩2#变,一次电气设备交接试验,电气调试试验,蟠龙扩2#变,改扩建工程一次设备试验,电气调试试验,蟠龙扩2#变,二次设备调试,电气调试试验,蟠龙扩2#变,电缆搬运、敷设二次接线,电缆敷设及二次接线,蟠龙扩2#变,软母线制作,软母线安装,蟠龙扩2#变,接地网施工,接地网施工,蟠龙扩2#主变,场地平整,站区四通一平、站区道路工程,蟠龙扩2#变,母线桥及其附件安装,母线桥施工作业,蟠龙扩2#变",
|
||
"foreman": "赵国伟班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "117.85977",
|
||
"lat": "33.650288",
|
||
"workManage": "赵国伟",
|
||
"workManagePhone": "18225880938",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12Q0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "池州电厂二期-涓桥220kV线路工程",
|
||
"workContent": "混凝土浇筑作业,混凝土浇筑,G16,混凝土浇筑作业,混凝土浇筑,G17",
|
||
"foreman": "常印宝",
|
||
"foremanPhone": null,
|
||
"ballStatus": "0",
|
||
"ballNo": null,
|
||
"lon": "117.610857",
|
||
"lat": "30.704281",
|
||
"workManage": "常印宝",
|
||
"workManagePhone": "13866538381",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12R0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "横山-贺庄220kV线路工程",
|
||
"workContent": "钢筋绑扎安装作业,钢筋工程,GB30,混凝土浇筑作业,混凝土浇筑,GB30,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,GB30,开掘敷设和焊接回填,接地工程,GB30",
|
||
"foreman": "牟世超",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "117.919264",
|
||
"lat": "32.678165",
|
||
"workManage": "牟世超",
|
||
"workManagePhone": "18164363677",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12M0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "洛河~汤庄、洛河~平圩500千伏线路改接工程",
|
||
"workContent": "一般土石方及掏挖基础机械开挖,一般土石方开挖,C2-1,一般土石方及掏挖基础机械开挖,一般土石方开挖,C2-2,一般土石方及掏挖基础机械开挖,一般土石方开挖,C2-3,钢筋绑扎安装作业,钢筋工程,C2-1,钢筋绑扎安装作业,钢筋工程,C2-2,钢筋绑扎安装作业,钢筋工程,C2-3,混凝土浇筑作业,混凝土浇筑,C2-1,混凝土浇筑作业,混凝土浇筑,C2-2,混凝土浇筑作业,混凝土浇筑,C2-3,开掘敷设和焊接回填,接地工程,C2-1,开掘敷设和焊接回填,接地工程,C2-2,开掘敷设和焊接回填,接地工程,C2-3",
|
||
"foreman": "赵雨刚班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "116.913591",
|
||
"lat": "32.703461",
|
||
"workManage": "赵雨刚",
|
||
"workManagePhone": "13909641183",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12Z0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "合肥袁河西路110kV变电站新建工程标段01",
|
||
"workContent": "檩条及墙板安装,钢结构安装,\t 合肥袁河西路110kV变电站新建工程 墙板安装、合肥袁河西路110kV变电站新建工程 水电安装、防水工程、土方开挖、砌体工程、接地施工",
|
||
"foreman": "土建施工班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "117.467036",
|
||
"lat": "31.903603",
|
||
"workManage": "罗铜",
|
||
"workManagePhone": "19123613437",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12A0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "慎城-半岗110kV架空线路工程",
|
||
"workContent": "机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,G27,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,G28,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,G29,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,G30,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,G31,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,G39,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,G41,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,G42,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,G43,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,G44,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,G48,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,G49,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,G50,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,G51,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,G52,开掘敷设和焊接回填,接地工程,#27,开掘敷设和焊接回填,接地工程,#28,开掘敷设和焊接回填,接地工程,#29,开掘敷设和焊接回填,接地工程,#30,开掘敷设和焊接回填,接地工程,#31,开掘敷设和焊接回填,接地工程,#32,开掘敷设和焊接回填,接地工程,#33,开掘敷设和焊接回填,接地工程,#34,开掘敷设和焊接回填,接地工程,#35,开掘敷设和焊接回填,接地工程,#36,开掘敷设和焊接回填,接地工程,#37,开掘敷设和焊接回填,接地工程,#38,开掘敷设和焊接回填,接地工程,#39,开掘敷设和焊接回填,接地工程,#40,开掘敷设和焊接回填,接地工程,#41,开掘敷设和焊接回填,接地工程,#42,开掘敷设和焊接回填,接地工程,#43,开掘敷设和焊接回填,接地工程,#44,开掘敷设和焊接回填,接地工程,#45,开掘敷设和焊接回填,接地工程,#46,开掘敷设和焊接回填,接地工程,#47,开掘敷设和焊接回填,接地工程,#48,开掘敷设和焊接回填,接地工程,#49,开掘敷设和焊接回填,接地工程,#5,开掘敷设和焊接回填,接地工程,#50,开掘敷设和焊接回填,接地工程,#51,开掘敷设和焊接回填,接地工程,#52",
|
||
"foreman": "鑫立土建",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "116.189505",
|
||
"lat": "32.523018",
|
||
"workManage": "陈献宝",
|
||
"workManagePhone": "18949909977",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12H0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "昭关-苍山220kV线路工程",
|
||
"workContent": "机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,A10,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,A12,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,A35,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,A5,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,A56,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,A57,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,A58,机械冲、钻孔灌注桩基础作业,机械冲、钻孔灌注桩基础作业,A9,混凝土浇筑作业,混凝土浇筑,A10,混凝土浇筑作业,混凝土浇筑,A12,混凝土浇筑作业,混凝土浇筑,A35,混凝土浇筑作业,混凝土浇筑,A5,混凝土浇筑作业,混凝土浇筑,A56,混凝土浇筑作业,混凝土浇筑,A57,混凝土浇筑作业,混凝土浇筑,A58,混凝土浇筑作业,混凝土浇筑,A9,开掘敷设和焊接回填,接地工程,A10,开掘敷设和焊接回填,接地工程,A12,开掘敷设和焊接回填,接地工程,A35,开掘敷设和焊接回填,接地工程,A5,开掘敷设和焊接回填,接地工程,A56,开掘敷设和焊接回填,接地工程,A57,开掘敷设和焊接回填,接地工程,A58,开掘敷设和焊接回填,接地工程,A9",
|
||
"foreman": "葛修成灌注桩班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "118.008044",
|
||
"lat": "31.678496",
|
||
"workManage": "葛修成",
|
||
"workManagePhone": "15312698578",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12B0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "刘铺(拂晓)35kV变电站新建工程",
|
||
"workContent": "围墙工程施工,围墙工程,刘铺(拂晓)35kV变电站新建工程,接地网施工,接地网施工,刘铺(拂晓)35kV变电站新建工程,电缆沟砌筑,砖砌电缆沟,刘铺(拂晓)35kV变电站新建工程,抹灰施工,抹灰工程,刘铺(拂晓)35kV变电站新建工程,开挖深度在3m以内的基坑挖土(不含3m),土方开挖,刘铺(拂晓)35kV变电站新建工程,装饰装修作业,装饰装修工程,刘铺(拂晓)35kV变电站新建工程,模板安拆,模板工程,刘铺(拂晓)35kV变电站新建工程,混凝土作业,混凝土工程,刘铺(拂晓)35kV变电站新建工程,装配式围墙施工,装配式围墙施工,刘铺(拂晓)35kV变电站新建工程,檩条及墙板安装,钢结构安装,刘铺(拂晓)35kV变电站新建工程,钢筋安装,钢筋工程,刘铺(拂晓)35kV变电站新建工程,水电作业,水电工程,刘铺(拂晓)35kV变电站新建工程",
|
||
"foreman": "黄翔",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "117.911921",
|
||
"lat": "32.578428",
|
||
"workManage": "黄翔",
|
||
"workManagePhone": "13696503804",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12M0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "合肥芮冲110kV变电站新建工程标段01",
|
||
"workContent": "装配式围墙施工,装配式围墙施工,芮冲变,檩条及墙板安装,钢结构安装,芮冲变",
|
||
"foreman": "钢结构班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "117.170819",
|
||
"lat": "31.708199",
|
||
"workManage": "武道广",
|
||
"workManagePhone": "15996968664",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12A0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "孔店~龙门500千伏线路增容改造工程",
|
||
"workContent": "一般土石方及掏挖基础机械开挖,一般土石方开挖,G17,一般土石方及掏挖基础机械开挖,一般土石方开挖,G8,开掘敷设和焊接回填,接地工程,G17,开掘敷设和焊接回填,接地工程,G8,混凝土浇筑作业,混凝土浇筑,G17,混凝土浇筑作业,混凝土浇筑,G8,钢筋绑扎安装作业,钢筋工程,G17,钢筋绑扎安装作业,钢筋工程,G8",
|
||
"foreman": "吴庆欢班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "117.083614",
|
||
"lat": "32.542806",
|
||
"workManage": "吴庆欢",
|
||
"workManagePhone": "18755487645",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12Z0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "4",
|
||
"proName": "东石笋~山七110kV线路工程",
|
||
"workContent": "导地线展放,导地线展放,B构架,B1#,B2#,紧线、挂线作业,紧线、挂线作业,B构架,B1#,B2#,杆塔螺栓复紧与消缺,角钢塔(钢管塔)施工,B1#-B34#,附件安装,杆塔附件安装,B构架,B1#,B2#",
|
||
"foreman": "洪增全班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "0",
|
||
"ballNo": null,
|
||
"lon": "116.552888",
|
||
"lat": "31.365645",
|
||
"workManage": "洪增全",
|
||
"workManagePhone": "18226527690",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12N0"
|
||
},
|
||
{
|
||
"createBy": null,
|
||
"createTime": null,
|
||
"updateBy": null,
|
||
"updateTime": null,
|
||
"remark": null,
|
||
"riskType": "3",
|
||
"proName": "池州金峰110kV变电站1号主变扩建工程",
|
||
"workContent": "二次电气设备安装,改扩建施工,变电站,电缆搬运、敷设二次接线,电缆敷设及二次接线,全站,二次设备调试,电气调试试验,全站",
|
||
"foreman": "张化飞班组",
|
||
"foremanPhone": null,
|
||
"ballStatus": "1",
|
||
"ballNo": null,
|
||
"lon": "118.016081",
|
||
"lat": "30.716834",
|
||
"workManage": "张化飞",
|
||
"workManagePhone": "13500590322",
|
||
"xy": null,
|
||
"currentDay": null,
|
||
"buildCode": "12R0"
|
||
}
|
||
] |